Power developer6 projects on record Data as of

Zelestra has 6 planned power projects totaling 1.2 GW in the FieldProspects database and no operating project on record. 74% of the planned capacity has an interconnection agreement and 17% is past its listed in-service date. 43 contacts at the company are on file.

1.2GW
planned, 6 projects
0MW
operating, 0 projects
915.3MW
interconnection agreement signed, 74% of planned
0MW
under construction, 0 projects
210MW
past due, 2 projects
43
contacts on file
Map

Where Zelestra's planned pipeline sits

Planned MW by state. The 2 largest states hold 1.2 GW of the 1.2 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas1 GW4 projects, 83% of planned
  2. Indiana210 MW2 projects, 17% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
1.2 GWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Solar 1.2 GW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar61.2 GW00 MW

MW by technologySolar has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed915.3 MW, 74%
5 of 6 planned projects (83%)
Under construction0 MW, 0%
0 of 6 planned projects (0%)
Past due210 MW, 17%
2 of 6 planned projects (33%)
17% of Zelestra's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Zelestra's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0200400600800 Snapshot year 2024 2025 2026 2027 705.3 MW 2028 2029
View as table
YearProjectsMW
20242210 MW
202500 MW
202600 MW
202700 MW
20283705.3 MW
20291323.2 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Zelestra's planned MW leans on ERCOT and Midcontinent ISO (MISO). ERCOT alone holds 83% of it.

Figure 2

Planned MW by grid operator

6 planned projects

ERCOT 1 GW 4 projects
Midcontinent ISO (MISO) 210 MW 2 projects
View as table
GridPlanned projectsPlanned MW
ERCOT41 GW
Midcontinent ISO (MISO)2210 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2025 was the biggest year.

0200400600 2019 2020 2021 2022 2023 2024 503.7 MW 2025 2026
View as table
Queue yearProjectsMW
20192210 MW
202000 MW
202100 MW
202200 MW
20231201.6 MW
202400 MW
20252503.7 MW
20261323.2 MW
Source. Every planned project has a queue date MW

Changes since the June 4, 2026 snapshot

What moved in Zelestra's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+1
project added, 323.2 MW
0
came online
0
cancelled, inactive or dropped
1
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: ZelestraChange: any 4 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
4 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Zelestra's pipeline moves.

Request access

Zelestra against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Zelestra ranks 130 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
130 Zelestra this page 6
1.2 GW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Zelestra

43 people at Zelestra

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 11 managers and 15 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

43 contacts

C-Suite 7
Head 4
VP 3
Director 15
Manager 11
Senior 3
View as table
SeniorityContacts
C-Suite7
Head4
VP3
Director15
Manager11
Senior3
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 43 contacts
PersonTitleDepartmentSeniorityContact
43 contacts at Zelestra for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Zelestra project

All 6 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: ZelestraSort: MW, largest first 6 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
6 projects and 1.2 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 43 contacts.

Request access

Get alerts for Zelestra

We email you when Zelestra adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Zelestra project and the 43 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.