EDF Renewables

Power developer69 projects on record Data as of

EDF Renewables has 54 planned power projects totaling 11.7 GW and 15 operating projects totaling 1.4 GW in the FieldProspects database. 68% of the planned capacity has an interconnection agreement and 2% is past its listed in-service date. 1 contact at the company are on file.

11.7GW
planned, 54 projects
1.4GW
operating, 15 projects
7.9GW
interconnection agreement signed, 68% of planned
321MW
under construction, 3 projects
225MW
past due, 2 projects
1
contacts on file
Map

Where EDF Renewables' planned pipeline sits

Planned MW by state. The 6 largest states hold 9.7 GW of the 11.7 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. California3.1 GW11 projects, 26% of planned
  2. Nevada1.7 GW6 projects, 15% of planned
  3. Texas1.5 GW8 projects, 13% of planned
  4. North Carolina1.5 GW7 projects, 13% of planned
  5. New York991.5 MW7 projects, 8% of planned
  6. Indiana870 MW4 projects, 7% of planned

7 more states with less.

Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
8.5MW planned

for every MW EDF Renewables operates today. Solar is most of the gap.

PlannedOperating
Solar 7.9 GW
897 MW
Battery Storage 2.5 GW
475 MW
Solar + Storage (Hybrid) 690 MW
none
Wind 626 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar377.9 GW12897 MW
Battery Storage112.5 GW3475 MW
Solar + Storage (Hybrid)3690 MW00 MW
Wind3626 MW00 MW

MW by technologySolar + Storage (Hybrid) and Wind have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed7.9 GW, 68%
37 of 54 planned projects (69%)
Under construction321 MW, 3%
3 of 54 planned projects (6%)
Past due225 MW, 2%
2 of 54 planned projects (4%)
2% of EDF Renewables' planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of EDF Renewables' planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
02k4k6k Snapshot year 2024 2025 682.6 MW 2026 2027 5.1 GW 2028 2029 2030 2031 2032 2033 2034
View as table
YearProjectsMW
20241100 MW
20251125 MW
20263682.6 MW
2027162.9 GW
2028235.1 GW
20293567.5 MW
20301400 MW
20312800 MW
20322800 MW
203300 MW
20342234 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

EDF Renewables' planned MW leans on California ISO (CAISO), PJM Interconnection and ERCOT. California ISO (CAISO) alone holds 41% of it.

Figure 2

Planned MW by grid operator

54 planned projects

California ISO (CAISO) 4.8 GW 17 projects
PJM Interconnection 2.9 GW 14 projects
ERCOT 1.5 GW 8 projects
New York ISO (NYISO) 991.5 MW 7 projects
Southwest Power Pool (SPP) 550 MW 3 projects
Arizona Public Service 500 MW 2 projects
Southern Company 250 MW 1 project
Midcontinent ISO (MISO) 225 MW 2 projects
View as table
GridPlanned projectsPlanned MW
California ISO (CAISO)174.8 GW
PJM Interconnection142.9 GW
ERCOT81.5 GW
New York ISO (NYISO)7991.5 MW
Southwest Power Pool (SPP)3550 MW
Arizona Public Service2500 MW
Southern Company1250 MW
Midcontinent ISO (MISO)2225 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2019 was the biggest year.

01k2k3k4k 2012 2013 2014 2015 2016 2017 2018 4 GW 2019 2020 2021 2022 2023 2024 2025
View as table
Queue yearProjectsMW
201200 MW
201300 MW
201400 MW
20151242.6 MW
201600 MW
201771.4 GW
20186873.7 MW
2019144 GW
20205866.2 MW
20213567.5 MW
202200 MW
202300 MW
202400 MW
2025110 MW
Source. 16 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in EDF Renewables' queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+2
projects added, 153 MW
0
came online
2
cancelled, inactive or dropped
8
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: EDF RenewablesChange: any 12 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
12 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when EDF Renewables' pipeline moves.

Request access

EDF Renewables against the next nine developers

The ten largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. EDF Renewables ranks 8 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables this page 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
10 BrightNight 25
10.5 GW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 10 by planned MW

1 person at EDF Renewables

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 1 director are where interconnection and procurement decisions start.

Figure 4

By seniority

1 contact

Director 1
View as table
SeniorityContacts
Director1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 1 contact
PersonTitleDepartmentSeniorityContact
1 contact at EDF Renewables for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every EDF Renewables project

All 69 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: EDF RenewablesSort: MW, largest first 69 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
69 projects and 13.1 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 1 contact.

Request access

Get alerts for EDF Renewables

We email you when EDF Renewables adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every EDF Renewables project and the 1 person behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.