EDF Renewables
EDF Renewables has 54 planned power projects totaling 11.7 GW and 15 operating projects totaling 1.4 GW in the FieldProspects database. 68% of the planned capacity has an interconnection agreement and 2% is past its listed in-service date. 1 contact at the company are on file.
Where EDF Renewables' planned pipeline sits
Planned MW by state. The 6 largest states hold 9.7 GW of the 11.7 GW.
Largest states
- California3.1 GW11 projects, 26% of planned
- Nevada1.7 GW6 projects, 15% of planned
- Texas1.5 GW8 projects, 13% of planned
- North Carolina1.5 GW7 projects, 13% of planned
- New York991.5 MW7 projects, 8% of planned
- Indiana870 MW4 projects, 7% of planned
7 more states with less.
for every MW EDF Renewables operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 37 | 7.9 GW | 12 | 897 MW |
| Battery Storage | 11 | 2.5 GW | 3 | 475 MW |
| Solar + Storage (Hybrid) | 3 | 690 MW | 0 | 0 MW |
| Wind | 3 | 626 MW | 0 | 0 MW |
MW by technologySolar + Storage (Hybrid) and Wind have no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of EDF Renewables' planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2024 | 1 | 100 MW |
| 2025 | 1 | 125 MW |
| 2026 | 3 | 682.6 MW |
| 2027 | 16 | 2.9 GW |
| 2028 | 23 | 5.1 GW |
| 2029 | 3 | 567.5 MW |
| 2030 | 1 | 400 MW |
| 2031 | 2 | 800 MW |
| 2032 | 2 | 800 MW |
| 2033 | 0 | 0 MW |
| 2034 | 2 | 234 MW |
Pipeline by grid and queue year
EDF Renewables' planned MW leans on California ISO (CAISO), PJM Interconnection and ERCOT. California ISO (CAISO) alone holds 41% of it.
Planned MW by grid operator
54 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| California ISO (CAISO) | 17 | 4.8 GW |
| PJM Interconnection | 14 | 2.9 GW |
| ERCOT | 8 | 1.5 GW |
| New York ISO (NYISO) | 7 | 991.5 MW |
| Southwest Power Pool (SPP) | 3 | 550 MW |
| Arizona Public Service | 2 | 500 MW |
| Southern Company | 1 | 250 MW |
| Midcontinent ISO (MISO) | 2 | 225 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2019 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2012 | 0 | 0 MW |
| 2013 | 0 | 0 MW |
| 2014 | 0 | 0 MW |
| 2015 | 1 | 242.6 MW |
| 2016 | 0 | 0 MW |
| 2017 | 7 | 1.4 GW |
| 2018 | 6 | 873.7 MW |
| 2019 | 14 | 4 GW |
| 2020 | 5 | 866.2 MW |
| 2021 | 3 | 567.5 MW |
| 2022 | 0 | 0 MW |
| 2023 | 0 | 0 MW |
| 2024 | 0 | 0 MW |
| 2025 | 1 | 10 MW |
Changes since the June 4, 2026 snapshot
What moved in EDF Renewables' queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when EDF Renewables' pipeline moves.
EDF Renewables against the next nine developers
The ten largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. EDF Renewables ranks 8 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables this page | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 10 | BrightNight | 25 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 10 by planned MW1 person at EDF Renewables
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 1 director are where interconnection and procurement decisions start.
By seniority
1 contact
View as table
| Seniority | Contacts |
|---|---|
| Director | 1 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every EDF Renewables project
All 69 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 1 contact.
Get alerts for EDF Renewables
We email you when EDF Renewables adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every EDF Renewables project and the 1 person behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.