Power developer163 projects on record Data as of

Invenergy has 135 planned power projects totaling 27.1 GW and 28 operating projects totaling 4.5 GW in the FieldProspects database. 91% of the planned capacity has an interconnection agreement and 28% is past its listed in-service date. 559 contacts at the company are on file.

27.1GW
planned, 135 projects
4.5GW
operating, 28 projects
24.7GW
interconnection agreement signed, 91% of planned
8.8GW
under construction, 41 projects
7.5GW
past due, 40 projects
559
contacts on file
Map

Where Invenergy's planned pipeline sits

Planned MW by state. The 6 largest states hold 15.3 GW of the 27.1 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas4.2 GW14 projects, 16% of planned
  2. Oklahoma3.7 GW16 projects, 14% of planned
  3. Wisconsin2.2 GW12 projects, 8% of planned
  4. Kansas1.9 GW12 projects, 7% of planned
  5. Ohio1.7 GW8 projects, 6% of planned
  6. Arkansas1.6 GW6 projects, 6% of planned

18 more states with less.

Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
6MW planned

for every MW Invenergy operates today. Solar is most of the gap.

PlannedOperating
Solar 15.9 GW
3 GW
Wind 8.7 GW
1.5 GW
Natural Gas 1.4 GW
none
Battery Storage 1 GW
70 MW
Solar + Storage (Hybrid) 200 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar8015.9 GW203 GW
Wind388.7 GW71.5 GW
Natural Gas21.4 GW00 MW
Battery Storage141 GW170 MW
Solar + Storage (Hybrid)1200 MW00 MW

MW by technologyNatural Gas and Solar + Storage (Hybrid) have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed24.7 GW, 91%
127 of 135 planned projects (94%)
Under construction8.8 GW, 32%
41 of 135 planned projects (30%)
Past due7.5 GW, 28%
40 of 135 planned projects (30%)
29% of Invenergy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Invenergy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
02k4k6k Snapshot year 2021 2022 2023 2024 2025 5.6 GW 2026 2027 2028 2029 2030 2031
View as table
YearProjectsMW
20212375 MW
202251 GW
20233950 MW
2024142.4 GW
2025173.2 GW
2026285.6 GW
2027244.1 GW
2028122.3 GW
2029183.8 GW
2030103 GW
20312375 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Invenergy's planned MW leans on Midcontinent ISO (MISO), Southwest Power Pool (SPP) and PJM Interconnection. Midcontinent ISO (MISO) alone holds 37% of it.

Figure 2

Planned MW by grid operator

135 planned projects

Midcontinent ISO (MISO) 10 GW 56 projects
Southwest Power Pool (SPP) 8.5 GW 42 projects
PJM Interconnection 3.2 GW 19 projects
ERCOT 3.1 GW 9 projects
New York ISO (NYISO) 1.3 GW 5 projects
Arizona Public Service 550 MW 2 projects
PacifiCorp East 400 MW 1 project
PacifiCorp West 55.9 MW 1 project
View as table
GridPlanned projectsPlanned MW
Midcontinent ISO (MISO)5610 GW
Southwest Power Pool (SPP)428.5 GW
PJM Interconnection193.2 GW
ERCOT93.1 GW
New York ISO (NYISO)51.3 GW
Arizona Public Service2550 MW
PacifiCorp East1400 MW
PacifiCorp West155.9 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2018 was the biggest year.

02k4k6k8k 2015 2016 2017 6.3 GW 2018 2019 2020 2021 2022 2023 2024 2025
View as table
Queue yearProjectsMW
20151290.7 MW
2016163.2 GW
2017183.5 GW
2018286.3 GW
2019345.3 GW
202071.2 GW
202171.2 GW
20221150.5 MW
20232539 MW
202431.6 GW
20251157.1 MW
Source. 17 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in Invenergy's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+2
projects added, 230 MW
4
came online
1
cancelled, inactive or dropped
12
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: InvenergyChange: any 20 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
20 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Invenergy's pipeline moves.

Request access

Invenergy against the next nine developers

The ten largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Invenergy ranks 2 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy this page 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
10 BrightNight 25
10.5 GW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 10 by planned MW

559 people at Invenergy

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 248 managers and 116 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

559 contacts

C-Suite 4
Founder 1
Owner 2
Head 1
VP 82
Director 116
Manager 248
Senior 104
Entry 1
View as table
SeniorityContacts
C-Suite4
Founder1
Owner2
Head1
VP82
Director116
Manager248
Senior104
Entry1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 559 contacts
PersonTitleDepartmentSeniorityContact
559 contacts at Invenergy for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Invenergy project

All 163 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: InvenergySort: MW, largest first 163 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
163 projects and 31.7 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 559 contacts.

Request access

Get alerts for Invenergy

We email you when Invenergy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Invenergy project and the 559 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.