Intersect Power
Intersect Power has 54 planned power projects totaling 25.3 GW and 5 operating projects totaling 1.2 GW in the FieldProspects database. 54% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 125 contacts at the company are on file.
Where Intersect Power's planned pipeline sits
Planned MW by state. The 2 largest states hold 25.3 GW of the 25.3 GW.
Largest states
- Texas16.6 GW32 projects, 66% of planned
- California8.7 GW22 projects, 34% of planned
for every MW Intersect Power operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 25 | 11.6 GW | 1 | 320 MW |
| Battery Storage | 19 | 7.2 GW | 4 | 830 MW |
| Wind | 10 | 6.5 GW | 0 | 0 MW |
MW by technologyWind has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Intersect Power's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 15 | 4.6 GW |
| 2027 | 8 | 5 GW |
| 2028 | 23 | 11.1 GW |
| 2029 | 8 | 4.6 GW |
Pipeline by grid and queue year
Intersect Power's planned MW leans on ERCOT and California ISO (CAISO). ERCOT alone holds 66% of it.
Planned MW by grid operator
54 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 32 | 16.6 GW |
| California ISO (CAISO) | 22 | 8.7 GW |
When the planned projects entered the queue
Planned MW by queue request year. 2023 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2017 | 2 | 202.7 MW |
| 2018 | 1 | 321.7 MW |
| 2019 | 2 | 1 GW |
| 2020 | 2 | 645.3 MW |
| 2021 | 5 | 3.6 GW |
| 2022 | 1 | 702.6 MW |
| 2023 | 9 | 6.2 GW |
| 2024 | 6 | 2.9 GW |
| 2025 | 3 | 1.9 GW |
Changes since the June 4, 2026 snapshot
What moved in Intersect Power's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Intersect Power's pipeline moves.
Intersect Power against the next nine developers
The ten largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Intersect Power ranks 3 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power this page | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 10 | BrightNight | 25 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 10 by planned MW125 people at Intersect Power
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 50 managers and 27 directors are where interconnection and procurement decisions start.
By seniority
125 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 3 |
| Founder | 1 |
| Head | 13 |
| VP | 8 |
| Director | 27 |
| Manager | 50 |
| Senior | 22 |
| Entry | 1 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Intersect Power project
All 59 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 125 contacts.
Get alerts for Intersect Power
We email you when Intersect Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Intersect Power project and the 125 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.