RWE

Power developer98 projects on record Data as of

RWE has 78 planned power projects totaling 12.8 GW and 20 operating projects totaling 3.2 GW in the FieldProspects database. 86% of the planned capacity has an interconnection agreement and 15% is past its listed in-service date. 678 contacts at the company are on file.

12.8GW
planned, 78 projects
3.2GW
operating, 20 projects
11GW
interconnection agreement signed, 86% of planned
1.3GW
under construction, 9 projects
1.9GW
past due, 11 projects
678
contacts on file
Map

Where RWE's planned pipeline sits

Planned MW by state. The 6 largest states hold 11.1 GW of the 12.8 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas6.3 GW39 projects, 49% of planned
  2. Illinois1.3 GW6 projects, 10% of planned
  3. Indiana1.2 GW6 projects, 9% of planned
  4. Virginia1.1 GW5 projects, 8% of planned
  5. Michigan750 MW4 projects, 6% of planned
  6. Maryland580 MW2 projects, 5% of planned

9 more states with less.

Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
4MW planned

for every MW RWE operates today. Solar is most of the gap.

PlannedOperating
Solar 4.8 GW
1.5 GW
Battery Storage 3.6 GW
705.6 MW
Wind 3.2 GW
924.4 MW
Solar + Storage (Hybrid) 1.2 GW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar294.8 GW91.5 GW
Battery Storage243.6 GW6705.6 MW
Wind213.2 GW5924.4 MW
Solar + Storage (Hybrid)41.2 GW00 MW

MW by technologySolar + Storage (Hybrid) has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed11 GW, 86%
64 of 78 planned projects (82%)
Under construction1.3 GW, 10%
9 of 78 planned projects (12%)
Past due1.9 GW, 15%
11 of 78 planned projects (14%)
15% of RWE's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of RWE's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
02k4k6k Snapshot year 2023 2024 2025 4.5 GW 2026 2027 2028 2029 2030 2031
View as table
YearProjectsMW
20231135 MW
20244525 MW
202561.3 GW
2026334.5 GW
2027152.7 GW
202881.1 GW
20295947.5 MW
20301500 MW
203141.1 GW
Source. 1 project with no listed date is left out MW

Pipeline by grid and queue year

RWE's planned MW leans on ERCOT, PJM Interconnection and Midcontinent ISO (MISO). ERCOT alone holds 46% of it.

Figure 2

Planned MW by grid operator

78 planned projects

ERCOT 5.9 GW 37 projects
PJM Interconnection 3.2 GW 17 projects
Midcontinent ISO (MISO) 2.2 GW 13 projects
Southwest Power Pool (SPP) 871.6 MW 6 projects
California ISO (CAISO) 588.5 MW 5 projects
View as table
GridPlanned projectsPlanned MW
ERCOT375.9 GW
PJM Interconnection173.2 GW
Midcontinent ISO (MISO)132.2 GW
Southwest Power Pool (SPP)6871.6 MW
California ISO (CAISO)5588.5 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2019 was the biggest year.

01k2k3k4k 2016 2017 2018 3.1 GW 2019 2020 2021 2022 2023 2024
View as table
Queue yearProjectsMW
20162198.6 MW
2017175 MW
201871.1 GW
2019173.1 GW
2020142.8 GW
2021101.7 GW
20223462.6 MW
2023111.1 GW
202481.5 GW
Source. 5 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in RWE's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
5
came online
0
cancelled, inactive or dropped
24
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: RWEChange: any 32 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
32 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when RWE's pipeline moves.

Request access

RWE against the next nine developers

The ten largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. RWE ranks 6 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE this page 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
10 BrightNight 25
10.5 GW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 10 by planned MW

678 people at RWE

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 331 managers and 99 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

678 contacts

C-Suite 6
Owner 4
Partner 10
Head 9
VP 68
Director 99
Manager 331
Senior 149
Entry 1
Unknown 1
View as table
SeniorityContacts
C-Suite6
Owner4
Partner10
Head9
VP68
Director99
Manager331
Senior149
Entry1
Unknown1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 678 contacts
PersonTitleDepartmentSeniorityContact
678 contacts at RWE for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every RWE project

All 98 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: RWESort: MW, largest first 98 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
98 projects and 16 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 678 contacts.

Request access

Get alerts for RWE

We email you when RWE adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every RWE project and the 678 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.