RWE has 78 planned power projects totaling 12.8 GW and 20 operating projects totaling 3.2 GW in the FieldProspects database. 86% of the planned capacity has an interconnection agreement and 15% is past its listed in-service date. 678 contacts at the company are on file.
Where RWE's planned pipeline sits
Planned MW by state. The 6 largest states hold 11.1 GW of the 12.8 GW.
for every MW RWE operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 29 | 4.8 GW | 9 | 1.5 GW |
| Battery Storage | 24 | 3.6 GW | 6 | 705.6 MW |
| Wind | 21 | 3.2 GW | 5 | 924.4 MW |
| Solar + Storage (Hybrid) | 4 | 1.2 GW | 0 | 0 MW |
MW by technologySolar + Storage (Hybrid) has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of RWE's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2023 | 1 | 135 MW |
| 2024 | 4 | 525 MW |
| 2025 | 6 | 1.3 GW |
| 2026 | 33 | 4.5 GW |
| 2027 | 15 | 2.7 GW |
| 2028 | 8 | 1.1 GW |
| 2029 | 5 | 947.5 MW |
| 2030 | 1 | 500 MW |
| 2031 | 4 | 1.1 GW |
Pipeline by grid and queue year
RWE's planned MW leans on ERCOT, PJM Interconnection and Midcontinent ISO (MISO). ERCOT alone holds 46% of it.
Planned MW by grid operator
78 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 37 | 5.9 GW |
| PJM Interconnection | 17 | 3.2 GW |
| Midcontinent ISO (MISO) | 13 | 2.2 GW |
| Southwest Power Pool (SPP) | 6 | 871.6 MW |
| California ISO (CAISO) | 5 | 588.5 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2019 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2016 | 2 | 198.6 MW |
| 2017 | 1 | 75 MW |
| 2018 | 7 | 1.1 GW |
| 2019 | 17 | 3.1 GW |
| 2020 | 14 | 2.8 GW |
| 2021 | 10 | 1.7 GW |
| 2022 | 3 | 462.6 MW |
| 2023 | 11 | 1.1 GW |
| 2024 | 8 | 1.5 GW |
Changes since the June 4, 2026 snapshot
What moved in RWE's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when RWE's pipeline moves.
RWE against the next nine developers
The ten largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. RWE ranks 6 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE this page | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 10 | BrightNight | 25 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 10 by planned MW678 people at RWE
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 331 managers and 99 directors are where interconnection and procurement decisions start.
By seniority
678 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 6 |
| Owner | 4 |
| Partner | 10 |
| Head | 9 |
| VP | 68 |
| Director | 99 |
| Manager | 331 |
| Senior | 149 |
| Entry | 1 |
| Unknown | 1 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every RWE project
All 98 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 678 contacts.
Get alerts for RWE
We email you when RWE adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every RWE project and the 678 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.