Engie
Engie has 80 planned power projects totaling 17.6 GW and 51 operating projects totaling 4.3 GW in the FieldProspects database. 57% of the planned capacity has an interconnection agreement and 6% is past its listed in-service date. 59 contacts at the company are on file.
Where Engie's planned pipeline sits
Planned MW by state. The 6 largest states hold 17.4 GW of the 17.6 GW.
for every MW Engie operates today. Battery Storage is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Battery Storage | 43 | 8.9 GW | 19 | 3.1 GW |
| Solar | 23 | 4.9 GW | 31 | 1.1 GW |
| Wind | 14 | 3.8 GW | 1 | 151.5 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Engie's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2023 | 3 | 250 MW |
| 2024 | 1 | 150 MW |
| 2025 | 3 | 603.5 MW |
| 2026 | 21 | 4.4 GW |
| 2027 | 19 | 3.8 GW |
| 2028 | 19 | 4.5 GW |
| 2029 | 10 | 2.7 GW |
| 2030 | 4 | 1.2 GW |
Pipeline by grid and queue year
Engie's planned MW leans on ERCOT, Southwest Power Pool (SPP) and Midcontinent ISO (MISO). ERCOT alone holds 81% of it.
Planned MW by grid operator
80 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 57 | 14.3 GW |
| Southwest Power Pool (SPP) | 7 | 2.2 GW |
| Midcontinent ISO (MISO) | 6 | 720 MW |
| PJM Interconnection | 7 | 230 MW |
| California ISO (CAISO) | 2 | 198 MW |
| Public Service Company of Colorado | 1 | 7.2 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2021 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2015 | 2 | 567.8 MW |
| 2016 | 0 | 0 MW |
| 2017 | 5 | 1.4 GW |
| 2018 | 4 | 681.4 MW |
| 2019 | 10 | 1.4 GW |
| 2020 | 19 | 3.9 GW |
| 2021 | 15 | 4.1 GW |
| 2022 | 3 | 505.5 MW |
| 2023 | 1 | 603.6 MW |
| 2024 | 4 | 1 GW |
| 2025 | 3 | 1.2 GW |
Changes since the June 4, 2026 snapshot
What moved in Engie's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Engie's pipeline moves.
Engie against the next nine developers
The ten largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Engie ranks 5 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie this page | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 10 | BrightNight | 25 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 10 by planned MW59 people at Engie
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 23 managers and 11 directors are where interconnection and procurement decisions start.
By seniority
59 contacts
View as table
| Seniority | Contacts |
|---|---|
| Partner | 3 |
| Head | 4 |
| VP | 4 |
| Director | 11 |
| Manager | 23 |
| Senior | 14 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Engie project
All 131 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 59 contacts.
Get alerts for Engie
We email you when Engie adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Engie project and the 59 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.