Power developer131 projects on record Data as of

Engie has 80 planned power projects totaling 17.6 GW and 51 operating projects totaling 4.3 GW in the FieldProspects database. 57% of the planned capacity has an interconnection agreement and 6% is past its listed in-service date. 59 contacts at the company are on file.

17.6GW
planned, 80 projects
4.3GW
operating, 51 projects
10GW
interconnection agreement signed, 57% of planned
1.5GW
under construction, 11 projects
1GW
past due, 7 projects
59
contacts on file
Map

Where Engie's planned pipeline sits

Planned MW by state. The 6 largest states hold 17.4 GW of the 17.6 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas14.4 GW58 projects, 82% of planned
  2. Kansas2 GW6 projects, 11% of planned
  3. Indiana350 MW2 projects, 2% of planned
  4. Iowa220 MW2 projects, 1% of planned
  5. California198 MW2 projects, 1% of planned
  6. Kentucky175 MW3 projects, 1% of planned

5 more states with less.

Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
4.1MW planned

for every MW Engie operates today. Battery Storage is most of the gap.

PlannedOperating
Battery Storage 8.9 GW
3.1 GW
Solar 4.9 GW
1.1 GW
Wind 3.8 GW
151.5 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage438.9 GW193.1 GW
Solar234.9 GW311.1 GW
Wind143.8 GW1151.5 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed10 GW, 57%
46 of 80 planned projects (57%)
Under construction1.5 GW, 8%
11 of 80 planned projects (14%)
Past due1 GW, 6%
7 of 80 planned projects (9%)
6% of Engie's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Engie's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
02k4k6k Snapshot year 2023 2024 2025 4.4 GW 2026 2027 4.5 GW 2028 2029 2030
View as table
YearProjectsMW
20233250 MW
20241150 MW
20253603.5 MW
2026214.4 GW
2027193.8 GW
2028194.5 GW
2029102.7 GW
203041.2 GW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Engie's planned MW leans on ERCOT, Southwest Power Pool (SPP) and Midcontinent ISO (MISO). ERCOT alone holds 81% of it.

Figure 2

Planned MW by grid operator

80 planned projects

ERCOT 14.3 GW 57 projects
Southwest Power Pool (SPP) 2.2 GW 7 projects
Midcontinent ISO (MISO) 720 MW 6 projects
PJM Interconnection 230 MW 7 projects
California ISO (CAISO) 198 MW 2 projects
Public Service Company of Colorado 7.2 MW 1 project
View as table
GridPlanned projectsPlanned MW
ERCOT5714.3 GW
Southwest Power Pool (SPP)72.2 GW
Midcontinent ISO (MISO)6720 MW
PJM Interconnection7230 MW
California ISO (CAISO)2198 MW
Public Service Company of Colorado17.2 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2021 was the biggest year.

02k4k6k 2015 2016 2017 2018 2019 2020 4.1 GW 2021 2022 2023 2024 2025
View as table
Queue yearProjectsMW
20152567.8 MW
201600 MW
201751.4 GW
20184681.4 MW
2019101.4 GW
2020193.9 GW
2021154.1 GW
20223505.5 MW
20231603.6 MW
202441 GW
202531.2 GW
Source. 14 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in Engie's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+1
project added, 7.2 MW
5
came online
0
cancelled, inactive or dropped
20
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: EngieChange: any 27 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
27 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Engie's pipeline moves.

Request access

Engie against the next nine developers

The ten largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Engie ranks 5 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie this page 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
10 BrightNight 25
10.5 GW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 10 by planned MW

59 people at Engie

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 23 managers and 11 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

59 contacts

Partner 3
Head 4
VP 4
Director 11
Manager 23
Senior 14
View as table
SeniorityContacts
Partner3
Head4
VP4
Director11
Manager23
Senior14
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 59 contacts
PersonTitleDepartmentSeniorityContact
59 contacts at Engie for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Engie project

All 131 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: EngieSort: MW, largest first 131 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
131 projects and 21.9 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 59 contacts.

Request access

Get alerts for Engie

We email you when Engie adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Engie project and the 59 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.