OCI Energy

Power developer46 projects on record Data as of

OCI Energy has 45 planned power projects totaling 10.6 GW and 1 operating project totaling 100 MW in the FieldProspects database. 21% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 17 contacts at the company are on file.

10.6GW
planned, 45 projects
100MW
operating, 1 project
2.2GW
interconnection agreement signed, 21% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
17
contacts on file
Map

Where OCI Energy's planned pipeline sits

Planned MW by state. The 2 largest states hold 10.6 GW of the 10.6 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas10.5 GW44 projects, 99% of planned
  2. Mississippi100 MW1 project, 1% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
106.4MW planned

for every MW OCI Energy operates today. Battery Storage is most of the gap.

PlannedOperating
Battery Storage 5.6 GW
100 MW
Solar 5.1 GW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage245.6 GW1100 MW
Solar215.1 GW00 MW

MW by technologySolar has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed2.2 GW, 21%
10 of 45 planned projects (22%)
Under construction0 MW, 0%
0 of 45 planned projects (0%)
Past due0 MW, 0%
0 of 45 planned projects (0%)
0% of OCI Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of OCI Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
02k4k6k Snapshot year 2026 2027 2028 5 GW 2029 2030 2031
View as table
YearProjectsMW
202600 MW
2027112 GW
2028102.8 GW
2029205 GW
20302450.7 MW
20312401.3 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

OCI Energy's planned MW leans on ERCOT and Midcontinent ISO (MISO). ERCOT alone holds 99% of it.

Figure 2

Planned MW by grid operator

45 planned projects

ERCOT 10.5 GW 44 projects
Midcontinent ISO (MISO) 100 MW 1 project
View as table
GridPlanned projectsPlanned MW
ERCOT4410.5 GW
Midcontinent ISO (MISO)1100 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2023 was the biggest year.

01k2k3k 2021 2022 2.4 GW 2023 2024 2025
View as table
Queue yearProjectsMW
20211265.1 MW
20222404.7 MW
202382.4 GW
202491.6 GW
20253754.1 MW
Source. 22 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in OCI Energy's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
16
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: OCI EnergyChange: any 16 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
16 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when OCI Energy's pipeline moves.

Request access

OCI Energy against the next nine developers

The ten largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. OCI Energy ranks 9 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy this page 45
10.6 GW
1
100 MW
0.01
10 BrightNight 25
10.5 GW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 10 by planned MW

17 people at OCI Energy

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 8 managers and 5 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

17 contacts

VP 4
Director 5
Manager 8
View as table
SeniorityContacts
VP4
Director5
Manager8
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 17 contacts
PersonTitleDepartmentSeniorityContact
17 contacts at OCI Energy for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every OCI Energy project

All 46 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: OCI EnergySort: MW, largest first 46 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
46 projects and 10.7 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 17 contacts.

Request access

Get alerts for OCI Energy

We email you when OCI Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every OCI Energy project and the 17 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.