OCI Energy
OCI Energy has 45 planned power projects totaling 10.6 GW and 1 operating project totaling 100 MW in the FieldProspects database. 21% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 17 contacts at the company are on file.
Where OCI Energy's planned pipeline sits
Planned MW by state. The 2 largest states hold 10.6 GW of the 10.6 GW.
Largest states
- Texas10.5 GW44 projects, 99% of planned
- Mississippi100 MW1 project, 1% of planned
for every MW OCI Energy operates today. Battery Storage is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Battery Storage | 24 | 5.6 GW | 1 | 100 MW |
| Solar | 21 | 5.1 GW | 0 | 0 MW |
MW by technologySolar has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of OCI Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 0 | 0 MW |
| 2027 | 11 | 2 GW |
| 2028 | 10 | 2.8 GW |
| 2029 | 20 | 5 GW |
| 2030 | 2 | 450.7 MW |
| 2031 | 2 | 401.3 MW |
Pipeline by grid and queue year
OCI Energy's planned MW leans on ERCOT and Midcontinent ISO (MISO). ERCOT alone holds 99% of it.
Planned MW by grid operator
45 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 44 | 10.5 GW |
| Midcontinent ISO (MISO) | 1 | 100 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2023 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2021 | 1 | 265.1 MW |
| 2022 | 2 | 404.7 MW |
| 2023 | 8 | 2.4 GW |
| 2024 | 9 | 1.6 GW |
| 2025 | 3 | 754.1 MW |
Changes since the June 4, 2026 snapshot
What moved in OCI Energy's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when OCI Energy's pipeline moves.
OCI Energy against the next nine developers
The ten largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. OCI Energy ranks 9 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy this page | 45 | 1 | 0.01 | ||
| 10 | BrightNight | 25 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 10 by planned MW17 people at OCI Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 8 managers and 5 directors are where interconnection and procurement decisions start.
By seniority
17 contacts
View as table
| Seniority | Contacts |
|---|---|
| VP | 4 |
| Director | 5 |
| Manager | 8 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every OCI Energy project
All 46 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 17 contacts.
Get alerts for OCI Energy
We email you when OCI Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every OCI Energy project and the 17 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.