BrightNight has 25 planned power projects totaling 10.5 GW in the FieldProspects database and no operating project on record. 8% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 82 contacts at the company are on file.
Where BrightNight's planned pipeline sits
Planned MW by state. The 6 largest states hold 9.7 GW of the 10.5 GW.
and no operating project on record yet. Everything here is pipeline.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 14 | 6.4 GW | 0 | 0 MW |
| Battery Storage | 10 | 3.9 GW | 0 | 0 MW |
| Wind | 1 | 200 MW | 0 | 0 MW |
MW by technology3 technologies have no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of BrightNight's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 1 | 200 MW |
| 2027 | 3 | 720 MW |
| 2028 | 0 | 0 MW |
| 2029 | 18 | 8.4 GW |
| 2030 | 0 | 0 MW |
| 2031 | 3 | 1.2 GW |
Pipeline by grid and queue year
BrightNight's planned MW leans on Bonneville Power Administration, Southern Company and Arizona Public Service. Bonneville Power Administration alone holds 30% of it.
Planned MW by grid operator
25 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| Bonneville Power Administration | 5 | 3.2 GW |
| Southern Company | 3 | 2.5 GW |
| Arizona Public Service | 4 | 1.2 GW |
| WAPA Rocky Mountain | 2 | 998 MW |
| PacifiCorp East | 2 | 600 MW |
| Portland General Electric | 2 | 494 MW |
| PJM Interconnection | 1 | 410 MW |
| Midcontinent ISO (MISO) | 2 | 400 MW |
| Puget Sound Energy | 2 | 370 MW |
| Louisville Gas & Electric / Kentucky Utilities | 2 | 320 MW |
Changes since the June 4, 2026 snapshot
What moved in BrightNight's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when BrightNight's pipeline moves.
BrightNight against the next nine developers
The ten largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. BrightNight ranks 10 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 10 | BrightNight this page | 25 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 10 by planned MW82 people at BrightNight
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 18 managers and 25 directors are where interconnection and procurement decisions start.
By seniority
82 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 3 |
| Founder | 2 |
| VP | 29 |
| Director | 25 |
| Manager | 18 |
| Senior | 5 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every BrightNight project
All 25 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 82 contacts.
Get alerts for BrightNight
We email you when BrightNight adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every BrightNight project and the 82 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.