FieldProspects

NextEra Energy

Power developer266 projects on record Data as of

NextEra Energy has 191 planned power projects totaling 36.8 GW and 75 operating projects totaling 11.7 GW in the FieldProspects database. 81% of the planned capacity has an interconnection agreement and 20% is past its listed in-service date. 906 contacts at the company are on file.

36.8GW
planned, 191 projects
11.7GW
operating, 75 projects
29.8GW
interconnection agreement signed, 81% of planned
5.2GW
under construction, 31 projects
7.3GW
past due, 48 projects
906
contacts on file
Map

Where NextEra Energy's planned pipeline sits

Planned MW by state. The 6 largest states hold 25.2 GW of the 36.8 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas9.4 GW51 projects, 25% of planned
  2. California4.3 GW12 projects, 12% of planned
  3. Kansas3.9 GW17 projects, 11% of planned
  4. Oklahoma3.6 GW18 projects, 10% of planned
  5. Indiana2.2 GW13 projects, 6% of planned
  6. Nebraska1.8 GW14 projects, 5% of planned

17 more states with less.

Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
3.1MW planned

for every MW NextEra Energy operates today. Solar is most of the gap.

PlannedOperating
Solar 21.7 GW
5 GW
Wind 7.7 GW
4.1 GW
Battery Storage 6.1 GW
2.7 GW
Solar + Storage (Hybrid) 1.2 GW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar10621.7 GW325 GW
Wind437.7 GW184.1 GW
Battery Storage366.1 GW252.7 GW
Solar + Storage (Hybrid)61.2 GW00 MW

MW by technologySolar + Storage (Hybrid) has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed29.8 GW, 81%
158 of 191 planned projects (83%)
Under construction5.2 GW, 14%
31 of 191 planned projects (16%)
Past due7.3 GW, 20%
48 of 191 planned projects (25%)
20% of NextEra Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of NextEra Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
02.5k5k7.5k10k Snapshot year 2018 2019 2020 2021 2022 2023 2024 2025 7.1 GW 2026 8.8 GW 2027 2028 2029 2030 2031
View as table
YearProjectsMW
2018149 MW
201900 MW
20201150 MW
20212290 MW
20225690 MW
2023142.1 GW
2024121.8 GW
2025132.2 GW
2026457.1 GW
2027388.8 GW
2028265.1 GW
2029123.4 GW
2030184.3 GW
20314901.1 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

NextEra Energy's planned MW leans on Southwest Power Pool (SPP), Midcontinent ISO (MISO) and ERCOT. Southwest Power Pool (SPP) alone holds 30% of it.

Figure 2

Planned MW by grid operator

191 planned projects

Southwest Power Pool (SPP) 11.2 GW 61 projects
Midcontinent ISO (MISO) 9.6 GW 58 projects
ERCOT 8.5 GW 45 projects
California ISO (CAISO) 5.7 GW 16 projects
New York ISO (NYISO) 1.1 GW 6 projects
PJM Interconnection 445 MW 3 projects
WAPA Rocky Mountain 200 MW 1 project
PNM Resources 120 MW 1 project
View as table
GridPlanned projectsPlanned MW
Southwest Power Pool (SPP)6111.2 GW
Midcontinent ISO (MISO)589.6 GW
ERCOT458.5 GW
California ISO (CAISO)165.7 GW
New York ISO (NYISO)61.1 GW
PJM Interconnection3445 MW
WAPA Rocky Mountain1200 MW
PNM Resources1120 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2017 was the biggest year.

02k4k6k8k 2013 2014 2015 2016 6.5 GW 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026
View as table
Queue yearProjectsMW
20132124.2 MW
201400 MW
201500 MW
201691.5 GW
2017386.5 GW
2018213.3 GW
2019243.9 GW
2020143.2 GW
2021164.5 GW
2022122.4 GW
2023101.5 GW
20245886.7 MW
20254963.2 MW
20262750 MW
Source. 34 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in NextEra Energy's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+10
projects added, 2.3 GW
10
came online
9
cancelled, inactive or dropped
19
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: NextEra EnergyChange: any 54 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
54 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when NextEra Energy's pipeline moves.

Request access

NextEra Energy against the next nine developers

The ten largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. NextEra Energy ranks 1 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy this page 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
10 BrightNight 25
10.5 GW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 10 by planned MW

906 people at NextEra Energy

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 431 managers and 191 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

906 contacts

C-Suite 7
Owner 5
Partner 12
Head 8
VP 31
Director 191
Manager 431
Senior 217
Entry 2
Unknown 2
View as table
SeniorityContacts
C-Suite7
Owner5
Partner12
Head8
VP31
Director191
Manager431
Senior217
Entry2
Unknown2
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 906 contacts
PersonTitleDepartmentSeniorityContact
906 contacts at NextEra Energy for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every NextEra Energy project

All 266 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: NextEra EnergySort: MW, largest first 266 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
266 projects and 48.5 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 906 contacts.

Request access

Get alerts for NextEra Energy

We email you when NextEra Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every NextEra Energy project and the 906 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.