NextEra Energy
NextEra Energy has 191 planned power projects totaling 36.8 GW and 75 operating projects totaling 11.7 GW in the FieldProspects database. 81% of the planned capacity has an interconnection agreement and 20% is past its listed in-service date. 906 contacts at the company are on file.
Where NextEra Energy's planned pipeline sits
Planned MW by state. The 6 largest states hold 25.2 GW of the 36.8 GW.
for every MW NextEra Energy operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 106 | 21.7 GW | 32 | 5 GW |
| Wind | 43 | 7.7 GW | 18 | 4.1 GW |
| Battery Storage | 36 | 6.1 GW | 25 | 2.7 GW |
| Solar + Storage (Hybrid) | 6 | 1.2 GW | 0 | 0 MW |
MW by technologySolar + Storage (Hybrid) has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of NextEra Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2018 | 1 | 49 MW |
| 2019 | 0 | 0 MW |
| 2020 | 1 | 150 MW |
| 2021 | 2 | 290 MW |
| 2022 | 5 | 690 MW |
| 2023 | 14 | 2.1 GW |
| 2024 | 12 | 1.8 GW |
| 2025 | 13 | 2.2 GW |
| 2026 | 45 | 7.1 GW |
| 2027 | 38 | 8.8 GW |
| 2028 | 26 | 5.1 GW |
| 2029 | 12 | 3.4 GW |
| 2030 | 18 | 4.3 GW |
| 2031 | 4 | 901.1 MW |
Pipeline by grid and queue year
NextEra Energy's planned MW leans on Southwest Power Pool (SPP), Midcontinent ISO (MISO) and ERCOT. Southwest Power Pool (SPP) alone holds 30% of it.
Planned MW by grid operator
191 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| Southwest Power Pool (SPP) | 61 | 11.2 GW |
| Midcontinent ISO (MISO) | 58 | 9.6 GW |
| ERCOT | 45 | 8.5 GW |
| California ISO (CAISO) | 16 | 5.7 GW |
| New York ISO (NYISO) | 6 | 1.1 GW |
| PJM Interconnection | 3 | 445 MW |
| WAPA Rocky Mountain | 1 | 200 MW |
| PNM Resources | 1 | 120 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2017 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2013 | 2 | 124.2 MW |
| 2014 | 0 | 0 MW |
| 2015 | 0 | 0 MW |
| 2016 | 9 | 1.5 GW |
| 2017 | 38 | 6.5 GW |
| 2018 | 21 | 3.3 GW |
| 2019 | 24 | 3.9 GW |
| 2020 | 14 | 3.2 GW |
| 2021 | 16 | 4.5 GW |
| 2022 | 12 | 2.4 GW |
| 2023 | 10 | 1.5 GW |
| 2024 | 5 | 886.7 MW |
| 2025 | 4 | 963.2 MW |
| 2026 | 2 | 750 MW |
Changes since the June 4, 2026 snapshot
What moved in NextEra Energy's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when NextEra Energy's pipeline moves.
NextEra Energy against the next nine developers
The ten largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. NextEra Energy ranks 1 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy this page | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 10 | BrightNight | 25 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 10 by planned MW906 people at NextEra Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 431 managers and 191 directors are where interconnection and procurement decisions start.
By seniority
906 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 7 |
| Owner | 5 |
| Partner | 12 |
| Head | 8 |
| VP | 31 |
| Director | 191 |
| Manager | 431 |
| Senior | 217 |
| Entry | 2 |
| Unknown | 2 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every NextEra Energy project
All 266 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 906 contacts.
Get alerts for NextEra Energy
We email you when NextEra Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every NextEra Energy project and the 906 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.