Hecate Energy

Power developer49 projects on record Data as of

Hecate Energy has 41 planned power projects totaling 18.1 GW and 8 operating projects totaling 1 GW in the FieldProspects database. 22% of the planned capacity has an interconnection agreement and 3% is past its listed in-service date. 37 contacts at the company are on file.

18.1GW
planned, 41 projects
1GW
operating, 8 projects
4GW
interconnection agreement signed, 22% of planned
557MW
under construction, 1 project
499MW
past due, 1 project
37
contacts on file
Map

Where Hecate Energy's planned pipeline sits

Planned MW by state. The 6 largest states hold 17.4 GW of the 18.1 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas13.7 GW25 projects, 76% of planned
  2. New York1.2 GW6 projects, 7% of planned
  3. Massachusetts800 MW3 projects, 4% of planned
  4. California740 MW3 projects, 4% of planned
  5. Kansas500 MW1 project, 3% of planned
  6. Oklahoma500 MW1 project, 3% of planned

2 more states with less.

Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
17.7MW planned

for every MW Hecate Energy operates today. Battery Storage is most of the gap.

PlannedOperating
Battery Storage 7.2 GW
40 MW
Solar 6.8 GW
980 MW
Wind 3.6 GW
none
Solar + Storage (Hybrid) 499 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage207.2 GW340 MW
Solar176.8 GW5980 MW
Wind33.6 GW00 MW
Solar + Storage (Hybrid)1499 MW00 MW

MW by technologyWind and Solar + Storage (Hybrid) have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed4 GW, 22%
13 of 41 planned projects (32%)
Under construction557 MW, 3%
1 of 41 planned projects (2%)
Past due499 MW, 3%
1 of 41 planned projects (2%)
3% of Hecate Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Hecate Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
02k4k6k Snapshot year 2025 608.6 MW 2026 2027 5.4 GW 2028 2029 2030
View as table
YearProjectsMW
20251499 MW
20262608.6 MW
2027102.3 GW
2028135.4 GW
2029104.8 GW
203054.5 GW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Hecate Energy's planned MW leans on ERCOT, New York ISO (NYISO) and Southwest Power Pool (SPP). ERCOT alone holds 76% of it.

Figure 2

Planned MW by grid operator

41 planned projects

ERCOT 13.7 GW 25 projects
New York ISO (NYISO) 1.2 GW 6 projects
Southwest Power Pool (SPP) 1 GW 2 projects
ISO New England 800 MW 3 projects
California ISO (CAISO) 740 MW 3 projects
Midcontinent ISO (MISO) 499 MW 1 project
PJM Interconnection 150 MW 1 project
View as table
GridPlanned projectsPlanned MW
ERCOT2513.7 GW
New York ISO (NYISO)61.2 GW
Southwest Power Pool (SPP)21 GW
ISO New England3800 MW
California ISO (CAISO)3740 MW
Midcontinent ISO (MISO)1499 MW
PJM Interconnection1150 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2021 was the biggest year.

02k4k6k 2016 2017 2018 2019 2020 4.9 GW 2021 2022 2023 2024
View as table
Queue yearProjectsMW
2016230 MW
2017160 MW
201800 MW
201951.8 GW
202073.2 GW
202194.9 GW
20222803.6 MW
202354.3 GW
20242662.3 MW
Source. 8 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in Hecate Energy's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
1
came online
5
cancelled, inactive or dropped
1
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Hecate EnergyChange: any 7 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
7 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Hecate Energy's pipeline moves.

Request access

Hecate Energy against the next nine developers

The ten largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Hecate Energy ranks 4 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy this page 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
10 BrightNight 25
10.5 GW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 10 by planned MW

37 people at Hecate Energy

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 12 managers and 5 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

37 contacts

C-Suite 4
Partner 1
VP 8
Director 5
Manager 12
Senior 7
View as table
SeniorityContacts
C-Suite4
Partner1
VP8
Director5
Manager12
Senior7
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 37 contacts
PersonTitleDepartmentSeniorityContact
37 contacts at Hecate Energy for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Hecate Energy project

All 49 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Hecate EnergySort: MW, largest first 49 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
49 projects and 19.1 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 37 contacts.

Request access

Get alerts for Hecate Energy

We email you when Hecate Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Hecate Energy project and the 37 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.