Hecate Energy
Hecate Energy has 41 planned power projects totaling 18.1 GW and 8 operating projects totaling 1 GW in the FieldProspects database. 22% of the planned capacity has an interconnection agreement and 3% is past its listed in-service date. 37 contacts at the company are on file.
Where Hecate Energy's planned pipeline sits
Planned MW by state. The 6 largest states hold 17.4 GW of the 18.1 GW.
Largest states
- Texas13.7 GW25 projects, 76% of planned
- New York1.2 GW6 projects, 7% of planned
- Massachusetts800 MW3 projects, 4% of planned
- California740 MW3 projects, 4% of planned
- Kansas500 MW1 project, 3% of planned
- Oklahoma500 MW1 project, 3% of planned
2 more states with less.
for every MW Hecate Energy operates today. Battery Storage is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Battery Storage | 20 | 7.2 GW | 3 | 40 MW |
| Solar | 17 | 6.8 GW | 5 | 980 MW |
| Wind | 3 | 3.6 GW | 0 | 0 MW |
| Solar + Storage (Hybrid) | 1 | 499 MW | 0 | 0 MW |
MW by technologyWind and Solar + Storage (Hybrid) have no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Hecate Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2025 | 1 | 499 MW |
| 2026 | 2 | 608.6 MW |
| 2027 | 10 | 2.3 GW |
| 2028 | 13 | 5.4 GW |
| 2029 | 10 | 4.8 GW |
| 2030 | 5 | 4.5 GW |
Pipeline by grid and queue year
Hecate Energy's planned MW leans on ERCOT, New York ISO (NYISO) and Southwest Power Pool (SPP). ERCOT alone holds 76% of it.
Planned MW by grid operator
41 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 25 | 13.7 GW |
| New York ISO (NYISO) | 6 | 1.2 GW |
| Southwest Power Pool (SPP) | 2 | 1 GW |
| ISO New England | 3 | 800 MW |
| California ISO (CAISO) | 3 | 740 MW |
| Midcontinent ISO (MISO) | 1 | 499 MW |
| PJM Interconnection | 1 | 150 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2021 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2016 | 2 | 30 MW |
| 2017 | 1 | 60 MW |
| 2018 | 0 | 0 MW |
| 2019 | 5 | 1.8 GW |
| 2020 | 7 | 3.2 GW |
| 2021 | 9 | 4.9 GW |
| 2022 | 2 | 803.6 MW |
| 2023 | 5 | 4.3 GW |
| 2024 | 2 | 662.3 MW |
Changes since the June 4, 2026 snapshot
What moved in Hecate Energy's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Hecate Energy's pipeline moves.
Hecate Energy against the next nine developers
The ten largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Hecate Energy ranks 4 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy this page | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 10 | BrightNight | 25 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 10 by planned MW37 people at Hecate Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 12 managers and 5 directors are where interconnection and procurement decisions start.
By seniority
37 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 4 |
| Partner | 1 |
| VP | 8 |
| Director | 5 |
| Manager | 12 |
| Senior | 7 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Hecate Energy project
All 49 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 37 contacts.
Get alerts for Hecate Energy
We email you when Hecate Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.