Avantus
Avantus has 49 planned power projects totaling 12.5 GW and 10 operating projects totaling 1.7 GW in the FieldProspects database. 41% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 75 contacts at the company are on file.
Where Avantus' planned pipeline sits
Planned MW by state. The 6 largest states hold 12.5 GW of the 12.5 GW.
Largest states
- California6.2 GW28 projects, 50% of planned
- Nevada4.4 GW10 projects, 35% of planned
- Arizona900 MW4 projects, 7% of planned
- Utah747 MW4 projects, 6% of planned
- New Mexico130 MW2 projects, 1% of planned
- Texas100 MW1 project, 1% of planned
for every MW Avantus operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 24 | 6.4 GW | 5 | 1 GW |
| Battery Storage | 25 | 6 GW | 5 | 675 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Avantus' planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 10 | 2.1 GW |
| 2027 | 10 | 2 GW |
| 2028 | 12 | 2.7 GW |
| 2029 | 11 | 4.1 GW |
| 2030 | 6 | 1.7 GW |
Pipeline by grid and queue year
Avantus' planned MW leans on California ISO (CAISO), Arizona Public Service and Nevada Power (NV Energy). California ISO (CAISO) alone holds 80% of it.
Planned MW by grid operator
49 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| California ISO (CAISO) | 36 | 10 GW |
| Arizona Public Service | 4 | 900 MW |
| Nevada Power (NV Energy) | 2 | 600 MW |
| Los Angeles Department of Water & Power | 2 | 450 MW |
| PacifiCorp East | 2 | 297 MW |
| PNM Resources | 2 | 130 MW |
| ERCOT | 1 | 100 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2019 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2015 | 4 | 725 MW |
| 2016 | 0 | 0 MW |
| 2017 | 0 | 0 MW |
| 2018 | 2 | 740 MW |
| 2019 | 6 | 3.3 GW |
| 2020 | 6 | 1.6 GW |
| 2021 | 2 | 112 MW |
Changes since the June 4, 2026 snapshot
What moved in Avantus' queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Avantus' pipeline moves.
Avantus against the next nine developers
The ten largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Avantus ranks 7 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus this page | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 10 | BrightNight | 25 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 10 by planned MW75 people at Avantus
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 19 managers and 22 directors are where interconnection and procurement decisions start.
By seniority
75 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 5 |
| Head | 1 |
| VP | 20 |
| Director | 22 |
| Manager | 19 |
| Senior | 8 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Avantus project
All 59 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 75 contacts.
Get alerts for Avantus
We email you when Avantus adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Avantus project and the 75 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.