Xcel Energy

Power developer13 projects on record Data as of

Xcel Energy has 9 planned power projects totaling 1.9 GW and 4 operating projects totaling 595.1 MW in the FieldProspects database. 99% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 4 states and 3 technologies.

1.9GW
planned, 9 projects
595.1MW
operating, 4 projects
1.9GW
interconnection agreement signed, 99% of planned
1.5GW
under construction, 5 projects
0MW
past due, 0 projects
4
states
Map

Where Xcel Energy's planned pipeline sits

Planned MW by state. The 4 largest states hold 1.9 GW of the 1.9 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Colorado1.4 GW4 projects, 72% of planned
  2. Minnesota345.5 MW3 projects, 18% of planned
  3. Texas150 MW1 project, 8% of planned
  4. New Mexico36 MW1 project, 2% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
3.2MW planned

for every MW Xcel Energy operates today. Wind is most of the gap.

PlannedOperating
Wind 1 GW
none
Solar 689 MW
559.1 MW
Battery Storage 181.5 MW
36 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Wind21 GW00 MW
Solar4689 MW3559.1 MW
Battery Storage3181.5 MW136 MW

MW by technologyWind has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed1.9 GW, 99%
8 of 9 planned projects (89%)
Under construction1.5 GW, 79%
5 of 9 planned projects (56%)
Past due0 MW, 0%
0 of 9 planned projects (0%)
0% of Xcel Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Xcel Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
05001k1.5k2k Snapshot year 1.8 GW 2026 2027 2028
View as table
YearProjectsMW
202671.8 GW
20271135.5 MW
2028110 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Xcel Energy's planned MW leans on Public Service Company of Colorado, Midcontinent ISO (MISO) and Southwest Power Pool (SPP). Public Service Company of Colorado alone holds 72% of it.

Figure 2

Planned MW by grid operator

9 planned projects

Public Service Company of Colorado 1.4 GW 4 projects
Midcontinent ISO (MISO) 345.5 MW 3 projects
Southwest Power Pool (SPP) 186 MW 2 projects
View as table
GridPlanned projectsPlanned MW
Public Service Company of Colorado41.4 GW
Midcontinent ISO (MISO)3345.5 MW
Southwest Power Pool (SPP)2186 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2020 was the biggest year.

050100150200 200 MW 2020 2021 2022 2023 2024
View as table
Queue yearProjectsMW
20201200 MW
202100 MW
202200 MW
20231150 MW
2024136 MW
Source. 6 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in Xcel Energy's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+1
project added, 135.5 MW
2
came online
0
cancelled, inactive or dropped
1
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Xcel EnergyChange: any 4 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
4 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Xcel Energy's pipeline moves.

Request access

Xcel Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Xcel Energy ranks 90 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
90 Xcel Energy this page 9
1.9 GW
4
595.1 MW
0.31

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Xcel Energy

Every Xcel Energy project

All 13 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Xcel EnergySort: MW, largest first 13 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
13 projects and 2.5 GW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Xcel Energy

We email you when Xcel Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Xcel Energy project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.