X-Elio
X-Elio has 12 planned power projects totaling 1.2 GW and 2 operating projects totaling 132.2 MW in the FieldProspects database. 85% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 7 contacts at the company are on file.
Where X-Elio's planned pipeline sits
Planned MW by state. The 2 largest states hold 1.2 GW of the 1.2 GW.
for every MW X-Elio operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 9 | 917.6 MW | 1 | 67.2 MW |
| Battery Storage | 3 | 305.3 MW | 1 | 65 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of X-Elio's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 4 | 401.6 MW |
| 2027 | 5 | 524.5 MW |
| 2028 | 1 | 90.8 MW |
| 2029 | 2 | 206.1 MW |
Pipeline by grid and queue year
X-Elio's planned MW leans on ERCOT and Southwest Power Pool (SPP). ERCOT alone holds 76% of it.
Planned MW by grid operator
12 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 9 | 926 MW |
| Southwest Power Pool (SPP) | 3 | 296.9 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2023 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2021 | 1 | 100.4 MW |
| 2022 | 4 | 445.3 MW |
| 2023 | 5 | 476.5 MW |
Changes since the June 4, 2026 snapshot
What moved in X-Elio's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when X-Elio's pipeline moves.
X-Elio against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. X-Elio ranks 135 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 135 | X-Elio this page | 12 | 2 | 0.11 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus X-Elio7 people at X-Elio
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 5 managers and 1 director are where interconnection and procurement decisions start.
By seniority
7 contacts
View as table
| Seniority | Contacts |
|---|---|
| VP | 1 |
| Director | 1 |
| Manager | 5 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every X-Elio project
All 14 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 7 contacts.
Get alerts for X-Elio
We email you when X-Elio adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every X-Elio project and the 7 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.