FieldProspects

X-Elio

Power developer14 projects on record Data as of

X-Elio has 12 planned power projects totaling 1.2 GW and 2 operating projects totaling 132.2 MW in the FieldProspects database. 85% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 7 contacts at the company are on file.

1.2GW
planned, 12 projects
132.2MW
operating, 2 projects
1GW
interconnection agreement signed, 85% of planned
200.8MW
under construction, 2 projects
0MW
past due, 0 projects
7
contacts on file
Map

Where X-Elio's planned pipeline sits

Planned MW by state. The 2 largest states hold 1.2 GW of the 1.2 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas1 GW10 projects, 83% of planned
  2. Oklahoma203.9 MW2 projects, 17% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
9.3MW planned

for every MW X-Elio operates today. Solar is most of the gap.

PlannedOperating
Solar 917.6 MW
67.2 MW
Battery Storage 305.3 MW
65 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar9917.6 MW167.2 MW
Battery Storage3305.3 MW165 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed1 GW, 85%
10 of 12 planned projects (83%)
Under construction200.8 MW, 16%
2 of 12 planned projects (17%)
Past due0 MW, 0%
0 of 12 planned projects (0%)
0% of X-Elio's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of X-Elio's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0200400600 Snapshot year 401.6 MW 2026 524.5 MW 2027 2028 2029
View as table
YearProjectsMW
20264401.6 MW
20275524.5 MW
2028190.8 MW
20292206.1 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

X-Elio's planned MW leans on ERCOT and Southwest Power Pool (SPP). ERCOT alone holds 76% of it.

Figure 2

Planned MW by grid operator

12 planned projects

ERCOT 926 MW 9 projects
Southwest Power Pool (SPP) 296.9 MW 3 projects
View as table
GridPlanned projectsPlanned MW
ERCOT9926 MW
Southwest Power Pool (SPP)3296.9 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2023 was the biggest year.

0200400600 2021 2022 476.5 MW 2023
View as table
Queue yearProjectsMW
20211100.4 MW
20224445.3 MW
20235476.5 MW
Source. 2 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in X-Elio's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
5
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: X-ElioChange: any 5 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
5 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when X-Elio's pipeline moves.

Request access

X-Elio against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. X-Elio ranks 135 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
135 X-Elio this page 12
1.2 GW
2
132.2 MW
0.11

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus X-Elio

7 people at X-Elio

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 5 managers and 1 director are where interconnection and procurement decisions start.

Figure 4

By seniority

7 contacts

VP 1
Director 1
Manager 5
View as table
SeniorityContacts
VP1
Director1
Manager5
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 7 contacts
PersonTitleDepartmentSeniorityContact
7 contacts at X-Elio for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every X-Elio project

All 14 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: X-ElioSort: MW, largest first 14 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
14 projects and 1.4 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 7 contacts.

Request access

Get alerts for X-Elio

We email you when X-Elio adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every X-Elio project and the 7 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.