FieldProspects

White Pine Development

Power developer7 projects on record Data as of

White Pine Development has 1 planned power project totaling 1.8 MW and 6 operating projects totaling 23.4 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 1 state and 2 technologies.

1.8MW
planned, 1 project
23.4MW
operating, 6 projects
1.8MW
interconnection agreement signed, 100% of planned
1.8MW
under construction, 1 project
0MW
past due, 0 projects
1
state
Map

Where White Pine Development's planned pipeline sits

Planned MW by state. Everything sits in California.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. California1.8 MW1 project, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
0.1MW planned

for every MW White Pine Development operates today.

PlannedOperating
Solar 1.8 MW
22.2 MW
Battery Storage none
1.2 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar11.8 MW522.2 MW
Battery Storage00 MW11.2 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed1.8 MW, 100%
1 of 1 planned project (100%)
Under construction1.8 MW, 100%
1 of 1 planned project (100%)
Past due0 MW, 0%
0 of 1 planned project (0%)
0% of White Pine Development's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of White Pine Development's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
00.511.52 Snapshot year 1.8 MW 2026
View as table
YearProjectsMW
202611.8 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

White Pine Development's planned MW sits entirely in California ISO (CAISO).

Figure 2

Planned MW by grid operator

1 planned project

California ISO (CAISO) 1.8 MW 1 project
View as table
GridPlanned projectsPlanned MW
California ISO (CAISO)11.8 MW

Changes since the June 4, 2026 snapshot

What moved in White Pine Development's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
1
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: White Pine DevelopmentChange: any 1 change since June 4, 2026
ChangeProjectTechnologyStateMWGrid
1 changed project behind this preview

Members see each changed project with its name, location and dates, and get an email when White Pine Development's pipeline moves.

Request access

White Pine Development against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. White Pine Development ranks 783 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
783 White Pine Development this page 1
1.8 MW
6
23.4 MW
13.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus White Pine Development

Every White Pine Development project

All 7 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: White Pine DevelopmentSort: MW, largest first 7 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
7 projects and 25.2 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for White Pine Development

We email you when White Pine Development adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every White Pine Development project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.