WEC Clean Energy

Power developer16 projects on record Data as of

WEC Clean Energy has 1 planned power project totaling 200 MW and 15 operating projects totaling 627 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 100% is past its listed in-service date. The projects sit in 1 state and 2 technologies.

200MW
planned, 1 project
627MW
operating, 15 projects
200MW
interconnection agreement signed, 100% of planned
0MW
under construction, 0 projects
200MW
past due, 1 project
1
state
Map

Where WEC Clean Energy's planned pipeline sits

Planned MW by state. Everything sits in Wisconsin.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Wisconsin200 MW1 project, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
0.3MW planned

for every MW WEC Clean Energy operates today.

PlannedOperating
Solar 200 MW
517 MW
Battery Storage none
110 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar1200 MW14517 MW
Battery Storage00 MW1110 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed200 MW, 100%
1 of 1 planned project (100%)
Under construction0 MW, 0%
0 of 1 planned project (0%)
Past due200 MW, 100%
1 of 1 planned project (100%)
100% of WEC Clean Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of WEC Clean Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
050100150200 Snapshot year 200 MW 2020 2021 2022 2023 2024 2025 2026
View as table
YearProjectsMW
20201200 MW
202100 MW
202200 MW
202300 MW
202400 MW
202500 MW
202600 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

WEC Clean Energy's planned MW sits entirely in Midcontinent ISO (MISO).

Figure 2

Planned MW by grid operator

1 planned project

Midcontinent ISO (MISO) 200 MW 1 project
View as table
GridPlanned projectsPlanned MW
Midcontinent ISO (MISO)1200 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2017 was the biggest year.

050100150200 200 MW 2017
View as table
Queue yearProjectsMW
20171200 MW
Source. Every planned project has a queue date MW

WEC Clean Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. WEC Clean Energy ranks 525 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
525 WEC Clean Energy this page 1
200 MW
15
627 MW
3.14

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus WEC Clean Energy

Every WEC Clean Energy project

All 16 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: WEC Clean EnergySort: MW, largest first 16 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
16 projects and 827 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for WEC Clean Energy

We email you when WEC Clean Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every WEC Clean Energy project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.