WEC Clean Energy
WEC Clean Energy has 1 planned power project totaling 200 MW and 15 operating projects totaling 627 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 100% is past its listed in-service date. The projects sit in 1 state and 2 technologies.
Where WEC Clean Energy's planned pipeline sits
Planned MW by state. Everything sits in Wisconsin.
Largest states
- Wisconsin200 MW1 project, 100% of planned
for every MW WEC Clean Energy operates today.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 1 | 200 MW | 14 | 517 MW |
| Battery Storage | 0 | 0 MW | 1 | 110 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of WEC Clean Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2020 | 1 | 200 MW |
| 2021 | 0 | 0 MW |
| 2022 | 0 | 0 MW |
| 2023 | 0 | 0 MW |
| 2024 | 0 | 0 MW |
| 2025 | 0 | 0 MW |
| 2026 | 0 | 0 MW |
Pipeline by grid and queue year
WEC Clean Energy's planned MW sits entirely in Midcontinent ISO (MISO).
Planned MW by grid operator
1 planned project
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| Midcontinent ISO (MISO) | 1 | 200 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2017 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2017 | 1 | 200 MW |
WEC Clean Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. WEC Clean Energy ranks 525 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 525 | WEC Clean Energy this page | 1 | 15 | 3.14 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus WEC Clean EnergyEvery WEC Clean Energy project
All 16 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both.
Get alerts for WEC Clean Energy
We email you when WEC Clean Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every WEC Clean Energy project, with its county, dates and queue status.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.