Power developer6 projects on record Data as of

We Energies has 6 planned power projects totaling 772.2 MW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 100% is past its listed in-service date. The projects sit in 1 state and 2 technologies.

772.2MW
planned, 6 projects
0MW
operating, 0 projects
772.2MW
interconnection agreement signed, 100% of planned
300MW
under construction, 2 projects
772.2MW
past due, 6 projects
1
state
Map

Where We Energies' planned pipeline sits

Planned MW by state. Everything sits in Wisconsin.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Wisconsin772.2 MW6 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
772.2 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Solar 722.2 MW
none
Battery Storage 50 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar5722.2 MW00 MW
Battery Storage150 MW00 MW

MW by technologySolar and Battery Storage have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed772.2 MW, 100%
6 of 6 planned projects (100%)
Under construction300 MW, 39%
2 of 6 planned projects (33%)
Past due772.2 MW, 100%
6 of 6 planned projects (100%)
100% of We Energies' planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of We Energies' planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0200400600 Snapshot year 2021 450 MW 2022 2023 2024 2025 2026
View as table
YearProjectsMW
20211100 MW
20222450 MW
202300 MW
202400 MW
20253222.2 MW
202600 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

We Energies' planned MW sits entirely in Midcontinent ISO (MISO).

Figure 2

Planned MW by grid operator

6 planned projects

Midcontinent ISO (MISO) 772.2 MW 6 projects
View as table
GridPlanned projectsPlanned MW
Midcontinent ISO (MISO)6772.2 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2017 was the biggest year.

0200400600 550 MW 2017 2018 2019 2020
View as table
Queue yearProjectsMW
20173550 MW
201800 MW
2019150 MW
20202172.2 MW
Source. Every planned project has a queue date MW

We Energies against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. We Energies ranks 212 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
212 We Energies this page 6
772.2 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus We Energies

Every We Energies project

All 6 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: We EnergiesSort: MW, largest first 6 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
6 projects and 772.2 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for We Energies

We email you when We Energies adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every We Energies project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.