Power developer1 project on record Data as of

WattBridge has 1 planned power project totaling 600 MW in the FieldProspects database and no operating project on record. 0% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 1 state and 1 technology.

600MW
planned, 1 project
0MW
operating, 0 projects
0MW
interconnection agreement signed, 0% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
1
state
Map

Where WattBridge's planned pipeline sits

Planned MW by state. Everything sits in Texas.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas600 MW1 project, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
600 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Natural Gas 600 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Natural Gas1600 MW00 MW

MW by technologyNatural Gas has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed0 MW, 0%
0 of 1 planned project (0%)
Under construction0 MW, 0%
0 of 1 planned project (0%)
Past due0 MW, 0%
0 of 1 planned project (0%)
0% of WattBridge's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of WattBridge's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0200400600 Snapshot year 2026 2027 2028 600 MW 2029
View as table
YearProjectsMW
202600 MW
202700 MW
202800 MW
20291600 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

WattBridge's planned MW sits entirely in ERCOT.

Figure 2

Planned MW by grid operator

1 planned project

ERCOT 600 MW 1 project
View as table
GridPlanned projectsPlanned MW
ERCOT1600 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2023 was the biggest year.

0200400600 600 MW 2023
View as table
Queue yearProjectsMW
20231600 MW
Source. Every planned project has a queue date MW

WattBridge against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. WattBridge ranks 253 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
253 WattBridge this page 1
600 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus WattBridge

Every WattBridge project

The one project with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: WattBridgeSort: MW, largest first 1 project
ProjectCountyGridMWQueue dateIn serviceAgreement
1 project and 600 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for WattBridge

We email you when WattBridge adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every WattBridge project, with its county, dates and queue status.