Walden Renewable
Walden Renewable has 7 planned power projects totaling 482 MW and 2 operating projects totaling 55 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 4% is past its listed in-service date. The projects sit in 3 states and 1 technology.
Where Walden Renewable's planned pipeline sits
Planned MW by state. The 3 largest states hold 482 MW of the 482 MW.
Largest states
- Pennsylvania422 MW4 projects, 88% of planned
- New Hampshire40 MW2 projects, 8% of planned
- Maine20 MW1 project, 4% of planned
for every MW Walden Renewable operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 7 | 482 MW | 2 | 55 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Walden Renewable's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2025 | 1 | 20 MW |
| 2026 | 4 | 240 MW |
| 2027 | 2 | 222 MW |
Pipeline by grid and queue year
Walden Renewable's planned MW leans on PJM Interconnection and ISO New England. PJM Interconnection alone holds 88% of it.
Planned MW by grid operator
7 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| PJM Interconnection | 4 | 422 MW |
| ISO New England | 3 | 60 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2019 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2019 | 4 | 362 MW |
| 2020 | 1 | 80 MW |
| 2021 | 1 | 20 MW |
Changes since the June 4, 2026 snapshot
What moved in Walden Renewable's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Walden Renewable's pipeline moves.
Walden Renewable against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Walden Renewable ranks 286 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 286 | Walden Renewable this page | 7 | 2 | 0.11 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Walden RenewableEvery Walden Renewable project
All 9 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both.
Get alerts for Walden Renewable
We email you when Walden Renewable adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Walden Renewable project, with its county, dates and queue status.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.