Vitol
Vitol has 2 planned power projects totaling 100 MW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 80% is past its listed in-service date. The projects sit in 2 states and 1 technology.
Where Vitol's planned pipeline sits
Planned MW by state. The 2 largest states hold 100 MW of the 100 MW.
Largest states
- Pennsylvania80 MW1 project, 80% of planned
- New York20 MW1 project, 20% of planned
and no operating project on record yet. Everything here is pipeline.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 2 | 100 MW | 0 | 0 MW |
MW by technologySolar has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Vitol's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2025 | 1 | 80 MW |
| 2026 | 0 | 0 MW |
| 2027 | 0 | 0 MW |
| 2028 | 0 | 0 MW |
| 2029 | 1 | 20 MW |
Pipeline by grid and queue year
Vitol's planned MW leans on PJM Interconnection and New York ISO (NYISO). PJM Interconnection alone holds 80% of it.
Planned MW by grid operator
2 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| PJM Interconnection | 1 | 80 MW |
| New York ISO (NYISO) | 1 | 20 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2019 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2019 | 2 | 100 MW |
Vitol against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Vitol ranks 625 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 625 | Vitol this page | 2 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus VitolEvery Vitol project
All 2 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both.
Get alerts for Vitol
We email you when Vitol adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Vitol project, with its county, dates and queue status.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.