Power developer2 projects on record Data as of

Vitol has 2 planned power projects totaling 100 MW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 80% is past its listed in-service date. The projects sit in 2 states and 1 technology.

100MW
planned, 2 projects
0MW
operating, 0 projects
100MW
interconnection agreement signed, 100% of planned
80MW
under construction, 1 project
80MW
past due, 1 project
2
states
Map

Where Vitol's planned pipeline sits

Planned MW by state. The 2 largest states hold 100 MW of the 100 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Pennsylvania80 MW1 project, 80% of planned
  2. New York20 MW1 project, 20% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
100 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Solar 100 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar2100 MW00 MW

MW by technologySolar has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed100 MW, 100%
2 of 2 planned projects (100%)
Under construction80 MW, 80%
1 of 2 planned projects (50%)
Past due80 MW, 80%
1 of 2 planned projects (50%)
80% of Vitol's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Vitol's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
020406080 Snapshot year 80 MW 2025 2026 2027 2028 2029
View as table
YearProjectsMW
2025180 MW
202600 MW
202700 MW
202800 MW
2029120 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Vitol's planned MW leans on PJM Interconnection and New York ISO (NYISO). PJM Interconnection alone holds 80% of it.

Figure 2

Planned MW by grid operator

2 planned projects

PJM Interconnection 80 MW 1 project
New York ISO (NYISO) 20 MW 1 project
View as table
GridPlanned projectsPlanned MW
PJM Interconnection180 MW
New York ISO (NYISO)120 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2019 was the biggest year.

0255075100 100 MW 2019
View as table
Queue yearProjectsMW
20192100 MW
Source. Every planned project has a queue date MW

Vitol against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Vitol ranks 625 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
625 Vitol this page 2
100 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Vitol

Every Vitol project

All 2 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: VitolSort: MW, largest first 2 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
2 projects and 100 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Vitol

We email you when Vitol adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Vitol project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.