Vitis Energy

Power developer2 projects on record Data as of

Vitis Energy has 2 planned power projects totaling 401.2 MW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 7 contacts at the company are on file.

401.2MW
planned, 2 projects
0MW
operating, 0 projects
401.2MW
interconnection agreement signed, 100% of planned
200MW
under construction, 1 project
0MW
past due, 0 projects
7
contacts on file
Map

Where Vitis Energy's planned pipeline sits

Planned MW by state. Everything sits in Texas.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas401.2 MW2 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
401.2 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Battery Storage 401.2 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage2401.2 MW00 MW

MW by technologyBattery Storage has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed401.2 MW, 100%
2 of 2 planned projects (100%)
Under construction200 MW, 50%
1 of 2 planned projects (50%)
Past due0 MW, 0%
0 of 2 planned projects (0%)
0% of Vitis Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Vitis Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0200400600 Snapshot year 401.2 MW 2026
View as table
YearProjectsMW
20262401.2 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Vitis Energy's planned MW sits entirely in ERCOT.

Figure 2

Planned MW by grid operator

2 planned projects

ERCOT 401.2 MW 2 projects
View as table
GridPlanned projectsPlanned MW
ERCOT2401.2 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2022 was the biggest year.

0100200300 201.2 MW 2022
View as table
Queue yearProjectsMW
20221201.2 MW
Source. 1 project without a queue date is left out MW

Changes since the June 4, 2026 snapshot

What moved in Vitis Energy's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
0
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Vitis EnergyChange: any 1 change since June 4, 2026
ChangeProjectTechnologyStateMWGrid
1 changed project behind this preview

Members see each changed project with its name, location and dates, and get an email when Vitis Energy's pipeline moves.

Request access

Vitis Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Vitis Energy ranks 329 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
329 Vitis Energy this page 2
401.2 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Vitis Energy

7 people at Vitis Energy

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 2 managers and 1 director are where interconnection and procurement decisions start.

Figure 4

By seniority

7 contacts

C-Suite 1
VP 2
Director 1
Manager 2
Senior 1
View as table
SeniorityContacts
C-Suite1
VP2
Director1
Manager2
Senior1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 7 contacts
PersonTitleDepartmentSeniorityContact
7 contacts at Vitis Energy for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Vitis Energy project

All 2 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Vitis EnergySort: MW, largest first 2 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
2 projects and 401.2 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 7 contacts.

Request access

Get alerts for Vitis Energy

We email you when Vitis Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Vitis Energy project and the 7 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.