Vistra
Vistra has 10 planned power projects totaling 1.1 GW and 11 operating projects totaling 622.2 MW in the FieldProspects database. 77% of the planned capacity has an interconnection agreement and 18% is past its listed in-service date. 1 contact at the company are on file.
Where Vistra's planned pipeline sits
Planned MW by state. The 3 largest states hold 1.1 GW of the 1.1 GW.
Largest states
- Illinois626 MW6 projects, 55% of planned
- Texas473.9 MW3 projects, 41% of planned
- California43.3 MW1 project, 4% of planned
for every MW Vistra operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 4 | 891.3 MW | 5 | 415.8 MW |
| Solar + Storage (Hybrid) | 5 | 208.6 MW | 0 | 0 MW |
| Battery Storage | 1 | 43.3 MW | 4 | 57.4 MW |
| Oil | 0 | 0 MW | 2 | 149 MW |
MW by technologySolar + Storage (Hybrid) has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Vistra's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2023 | 2 | 71.8 MW |
| 2024 | 3 | 136.8 MW |
| 2025 | 0 | 0 MW |
| 2026 | 3 | 668.5 MW |
| 2027 | 0 | 0 MW |
| 2028 | 1 | 43.3 MW |
| 2029 | 0 | 0 MW |
| 2030 | 1 | 222.8 MW |
Pipeline by grid and queue year
Vistra's planned MW leans on ERCOT, GridLiance Heartland and Midcontinent ISO (MISO). ERCOT alone holds 41% of it.
Planned MW by grid operator
10 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 3 | 473.9 MW |
| GridLiance Heartland | 1 | 417.4 MW |
| Midcontinent ISO (MISO) | 5 | 208.6 MW |
| California ISO (CAISO) | 1 | 43.3 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2019 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2019 | 5 | 208.6 MW |
| 2020 | 0 | 0 MW |
| 2021 | 1 | 201.1 MW |
| 2022 | 1 | 50 MW |
Changes since the June 4, 2026 snapshot
What moved in Vistra's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Vistra's pipeline moves.
Vistra against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Vistra ranks 149 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 149 | Vistra this page | 10 | 11 | 0.54 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Vistra1 person at Vistra
Contacts with title, seniority, department, email and LinkedIn, counted here and never named.
By seniority
1 contact
View as table
| Seniority | Contacts |
|---|---|
| VP | 1 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Vistra project
All 21 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 1 contact.
Get alerts for Vistra
We email you when Vistra adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Vistra project and the 1 person behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.