Vestas
Vestas has 3 planned power projects totaling 662 MW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 60% is past its listed in-service date. The projects sit in 3 states and 1 technology.
Where Vestas' planned pipeline sits
Planned MW by state. The 3 largest states hold 662 MW of the 662 MW.
Largest states
- Texas262 MW1 project, 40% of planned
- Iowa200 MW1 project, 30% of planned
- Mississippi200 MW1 project, 30% of planned
and no operating project on record yet. Everything here is pipeline.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Wind | 3 | 662 MW | 0 | 0 MW |
MW by technologyWind has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Vestas' planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2021 | 1 | 200 MW |
| 2022 | 0 | 0 MW |
| 2023 | 0 | 0 MW |
| 2024 | 1 | 200 MW |
| 2025 | 0 | 0 MW |
| 2026 | 0 | 0 MW |
| 2027 | 1 | 262 MW |
Pipeline by grid and queue year
Vestas' planned MW leans on Midcontinent ISO (MISO) and ERCOT. Midcontinent ISO (MISO) alone holds 60% of it.
Planned MW by grid operator
3 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| Midcontinent ISO (MISO) | 2 | 400 MW |
| ERCOT | 1 | 262 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2021 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2017 | 1 | 200 MW |
| 2018 | 0 | 0 MW |
| 2019 | 1 | 200 MW |
| 2020 | 0 | 0 MW |
| 2021 | 1 | 262 MW |
Changes since the June 4, 2026 snapshot
What moved in Vestas' queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Vestas' pipeline moves.
Vestas against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Vestas ranks 236 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 236 | Vestas this page | 3 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus VestasEvery Vestas project
All 3 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both.
Get alerts for Vestas
We email you when Vestas adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Vestas project, with its county, dates and queue status.