Vesper Energy

Power developer47 projects on record Data as of

Vesper Energy has 46 planned power projects totaling 9.1 GW and 1 operating project totaling 600 MW in the FieldProspects database. 26% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 48 contacts at the company are on file.

9.1GW
planned, 46 projects
600MW
operating, 1 project
2.3GW
interconnection agreement signed, 26% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
48
contacts on file
Map

Where Vesper Energy's planned pipeline sits

Planned MW by state. The 6 largest states hold 8.9 GW of the 9.1 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas5.9 GW26 projects, 65% of planned
  2. California1.1 GW9 projects, 12% of planned
  3. Missouri800 MW4 projects, 9% of planned
  4. Pennsylvania602.6 MW3 projects, 7% of planned
  5. Illinois300 MW2 projects, 3% of planned
  6. Virginia201.1 MW1 project, 2% of planned

1 more state with less.

Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
15.2MW planned

for every MW Vesper Energy operates today. Solar is most of the gap.

PlannedOperating
Solar 5.3 GW
600 MW
Battery Storage 3.8 GW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar235.3 GW1600 MW
Battery Storage233.8 GW00 MW

MW by technologyBattery Storage has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed2.3 GW, 26%
11 of 46 planned projects (24%)
Under construction0 MW, 0%
0 of 46 planned projects (0%)
Past due0 MW, 0%
0 of 46 planned projects (0%)
0% of Vesper Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Vesper Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
02k4k6k Snapshot year 2026 2027 5 GW 2028 2029
View as table
YearProjectsMW
202600 MW
2027173.5 GW
2028255 GW
20294618.5 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Vesper Energy's planned MW leans on ERCOT, Midcontinent ISO (MISO) and PJM Interconnection. ERCOT alone holds 65% of it.

Figure 2

Planned MW by grid operator

46 planned projects

ERCOT 5.9 GW 26 projects
Midcontinent ISO (MISO) 1.1 GW 6 projects
PJM Interconnection 978.7 MW 5 projects
California ISO (CAISO) 780 MW 5 projects
WAPA Desert Southwest 200 MW 2 projects
Balancing Authority of Northern California 100 MW 2 projects
View as table
GridPlanned projectsPlanned MW
ERCOT265.9 GW
Midcontinent ISO (MISO)61.1 GW
PJM Interconnection5978.7 MW
California ISO (CAISO)5780 MW
WAPA Desert Southwest2200 MW
Balancing Authority of Northern California2100 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2023 was the biggest year.

05001k1.5k 2014 2015 2016 2017 2018 2019 2020 2021 2022 1.3 GW 2023 2024 2025 2026
View as table
Queue yearProjectsMW
20141203 MW
201500 MW
201600 MW
201700 MW
201800 MW
20191100.5 MW
202000 MW
202100 MW
20224723.4 MW
202361.3 GW
20244618.5 MW
202500 MW
202610 MW
Source. 29 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in Vesper Energy's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
2
cancelled, inactive or dropped
9
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Vesper EnergyChange: any 13 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
13 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Vesper Energy's pipeline moves.

Request access

Vesper Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Vesper Energy ranks 15 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
15 Vesper Energy this page 46
9.1 GW
1
600 MW
0.07

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Vesper Energy

48 people at Vesper Energy

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 20 managers and 12 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

48 contacts

C-Suite 4
Head 1
VP 8
Director 12
Manager 20
Senior 3
View as table
SeniorityContacts
C-Suite4
Head1
VP8
Director12
Manager20
Senior3
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 48 contacts
PersonTitleDepartmentSeniorityContact
48 contacts at Vesper Energy for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Vesper Energy project

All 47 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Vesper EnergySort: MW, largest first 47 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
47 projects and 9.7 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 48 contacts.

Request access

Get alerts for Vesper Energy

We email you when Vesper Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Vesper Energy project and the 48 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.