Vesper Energy
Vesper Energy has 46 planned power projects totaling 9.1 GW and 1 operating project totaling 600 MW in the FieldProspects database. 26% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 48 contacts at the company are on file.
Where Vesper Energy's planned pipeline sits
Planned MW by state. The 6 largest states hold 8.9 GW of the 9.1 GW.
Largest states
- Texas5.9 GW26 projects, 65% of planned
- California1.1 GW9 projects, 12% of planned
- Missouri800 MW4 projects, 9% of planned
- Pennsylvania602.6 MW3 projects, 7% of planned
- Illinois300 MW2 projects, 3% of planned
- Virginia201.1 MW1 project, 2% of planned
1 more state with less.
for every MW Vesper Energy operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 23 | 5.3 GW | 1 | 600 MW |
| Battery Storage | 23 | 3.8 GW | 0 | 0 MW |
MW by technologyBattery Storage has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Vesper Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 0 | 0 MW |
| 2027 | 17 | 3.5 GW |
| 2028 | 25 | 5 GW |
| 2029 | 4 | 618.5 MW |
Pipeline by grid and queue year
Vesper Energy's planned MW leans on ERCOT, Midcontinent ISO (MISO) and PJM Interconnection. ERCOT alone holds 65% of it.
Planned MW by grid operator
46 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 26 | 5.9 GW |
| Midcontinent ISO (MISO) | 6 | 1.1 GW |
| PJM Interconnection | 5 | 978.7 MW |
| California ISO (CAISO) | 5 | 780 MW |
| WAPA Desert Southwest | 2 | 200 MW |
| Balancing Authority of Northern California | 2 | 100 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2023 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2014 | 1 | 203 MW |
| 2015 | 0 | 0 MW |
| 2016 | 0 | 0 MW |
| 2017 | 0 | 0 MW |
| 2018 | 0 | 0 MW |
| 2019 | 1 | 100.5 MW |
| 2020 | 0 | 0 MW |
| 2021 | 0 | 0 MW |
| 2022 | 4 | 723.4 MW |
| 2023 | 6 | 1.3 GW |
| 2024 | 4 | 618.5 MW |
| 2025 | 0 | 0 MW |
| 2026 | 1 | 0 MW |
Changes since the June 4, 2026 snapshot
What moved in Vesper Energy's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Vesper Energy's pipeline moves.
Vesper Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Vesper Energy ranks 15 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 15 | Vesper Energy this page | 46 | 1 | 0.07 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Vesper Energy48 people at Vesper Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 20 managers and 12 directors are where interconnection and procurement decisions start.
By seniority
48 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 4 |
| Head | 1 |
| VP | 8 |
| Director | 12 |
| Manager | 20 |
| Senior | 3 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Vesper Energy project
All 47 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 48 contacts.
Get alerts for Vesper Energy
We email you when Vesper Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Vesper Energy project and the 48 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.