Verogy has 2 planned power projects totaling 69 MW and 8 operating projects totaling 26.1 MW in the FieldProspects database. 1% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 19 contacts at the company are on file.
Where Verogy's planned pipeline sits
Planned MW by state. Everything sits in Maine.
Largest states
- Maine69 MW2 projects, 100% of planned
for every MW Verogy operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 2 | 69 MW | 8 | 26.1 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Verogy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 1 | 1 MW |
| 2027 | 0 | 0 MW |
| 2028 | 0 | 0 MW |
| 2029 | 1 | 68 MW |
Pipeline by grid and queue year
Verogy's planned MW sits entirely in ISO New England.
Planned MW by grid operator
2 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ISO New England | 2 | 69 MW |
Changes since the June 4, 2026 snapshot
What moved in Verogy's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Verogy's pipeline moves.
Verogy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Verogy ranks 663 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 663 | Verogy this page | 2 | 8 | 0.38 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Verogy19 people at Verogy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 7 managers and 1 director are where interconnection and procurement decisions start.
By seniority
19 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 1 |
| Founder | 4 |
| VP | 6 |
| Director | 1 |
| Manager | 7 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Verogy project
All 10 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 19 contacts.
Get alerts for Verogy
We email you when Verogy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Verogy project and the 19 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.