Power developer3 projects on record Data as of

V20 Energy has 3 planned power projects totaling 60 MW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 33% is past its listed in-service date. The projects sit in 1 state and 1 technology.

60MW
planned, 3 projects
0MW
operating, 0 projects
60MW
interconnection agreement signed, 100% of planned
20MW
under construction, 1 project
20MW
past due, 1 project
1
state
Map

Where V20 Energy's planned pipeline sits

Planned MW by state. Everything sits in New Jersey.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. New Jersey60 MW3 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
60 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Battery Storage 60 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage360 MW00 MW

MW by technologyBattery Storage has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed60 MW, 100%
3 of 3 planned projects (100%)
Under construction20 MW, 33%
1 of 3 planned projects (33%)
Past due20 MW, 33%
1 of 3 planned projects (33%)
33% of V20 Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of V20 Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
010203040 Snapshot year 2024 2025 40 MW 2026
View as table
YearProjectsMW
2024120 MW
202500 MW
2026240 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

V20 Energy's planned MW sits entirely in PJM Interconnection.

Figure 2

Planned MW by grid operator

3 planned projects

PJM Interconnection 60 MW 3 projects
View as table
GridPlanned projectsPlanned MW
PJM Interconnection360 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2019 was the biggest year.

010203040 2018 40 MW 2019
View as table
Queue yearProjectsMW
2018120 MW
2019240 MW
Source. Every planned project has a queue date MW

V20 Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. V20 Energy ranks 671 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
671 V20 Energy this page 3
60 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus V20 Energy

Every V20 Energy project

All 3 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: V20 EnergySort: MW, largest first 3 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
3 projects and 60 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for V20 Energy

We email you when V20 Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every V20 Energy project, with its county, dates and queue status.