Urban Grid
Urban Grid has 7 planned power projects totaling 749.2 MW and 6 operating projects totaling 515.2 MW in the FieldProspects database. 32% of the planned capacity has an interconnection agreement and 10% is past its listed in-service date. 79 contacts at the company are on file.
Where Urban Grid's planned pipeline sits
Planned MW by state. The 5 largest states hold 749.2 MW of the 749.2 MW.
Largest states
- Alabama400 MW2 projects, 53% of planned
- Arkansas150 MW2 projects, 20% of planned
- Virginia120 MW1 project, 16% of planned
- Maryland45 MW1 project, 6% of planned
- Pennsylvania34.2 MW1 project, 5% of planned
for every MW Urban Grid operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 7 | 749.2 MW | 6 | 515.2 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Urban Grid's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2024 | 1 | 75 MW |
| 2025 | 0 | 0 MW |
| 2026 | 1 | 45 MW |
| 2027 | 3 | 309.2 MW |
| 2028 | 2 | 320 MW |
Pipeline by grid and queue year
Urban Grid's planned MW leans on Tennessee Valley Authority, PJM Interconnection and Midcontinent ISO (MISO). Tennessee Valley Authority alone holds 53% of it.
Planned MW by grid operator
7 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| Tennessee Valley Authority | 2 | 400 MW |
| PJM Interconnection | 3 | 199.2 MW |
| Midcontinent ISO (MISO) | 2 | 150 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2018 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2016 | 1 | 45 MW |
| 2017 | 0 | 0 MW |
| 2018 | 1 | 120 MW |
| 2019 | 1 | 75 MW |
Changes since the June 4, 2026 snapshot
What moved in Urban Grid's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Urban Grid's pipeline moves.
Urban Grid against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Urban Grid ranks 221 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 221 | Urban Grid this page | 7 | 6 | 0.69 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Urban Grid79 people at Urban Grid
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 38 managers and 15 directors are where interconnection and procurement decisions start.
By seniority
79 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 2 |
| VP | 6 |
| Director | 15 |
| Manager | 38 |
| Senior | 18 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Urban Grid project
All 13 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 79 contacts.
Get alerts for Urban Grid
We email you when Urban Grid adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Urban Grid project and the 79 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.