FieldProspects

UBS

Power developer2 projects on record Data as of

UBS has 1 planned power project totaling 121 MW and 1 operating project totaling 98.4 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 1 state and 1 technology.

121MW
planned, 1 project
98.4MW
operating, 1 project
121MW
interconnection agreement signed, 100% of planned
121MW
under construction, 1 project
0MW
past due, 0 projects
1
state
Map

Where UBS's planned pipeline sits

Planned MW by state. Everything sits in Texas.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas121 MW1 project, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
1.2MW planned

for every MW UBS operates today. Battery Storage is most of the gap.

PlannedOperating
Battery Storage 121 MW
98.4 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage1121 MW198.4 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed121 MW, 100%
1 of 1 planned project (100%)
Under construction121 MW, 100%
1 of 1 planned project (100%)
Past due0 MW, 0%
0 of 1 planned project (0%)
0% of UBS's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of UBS's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
050100150 Snapshot year 121 MW 2026
View as table
YearProjectsMW
20261121 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

UBS's planned MW sits entirely in ERCOT.

Figure 2

Planned MW by grid operator

1 planned project

ERCOT 121 MW 1 project
View as table
GridPlanned projectsPlanned MW
ERCOT1121 MW

Changes since the June 4, 2026 snapshot

What moved in UBS's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
2
came online
0
cancelled, inactive or dropped
0
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: UBSChange: any 4 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
4 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when UBS's pipeline moves.

Request access

UBS against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. UBS ranks 597 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
597 UBS this page 1
121 MW
1
98.4 MW
0.81

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus UBS

Every UBS project

All 2 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: UBSSort: MW, largest first 2 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
2 projects and 219.4 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for UBS

We email you when UBS adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every UBS project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.