Tyr Energy
Tyr Energy has 5 planned power projects totaling 633 MW and 2 operating projects totaling 234 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 53% is past its listed in-service date. 16 contacts at the company are on file.
Where Tyr Energy's planned pipeline sits
Planned MW by state. The 3 largest states hold 633 MW of the 633 MW.
for every MW Tyr Energy operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 4 | 633 MW | 2 | 234 MW |
| Battery Storage | 1 | 0 MW | 0 | 0 MW |
MW by technologyBattery Storage has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Tyr Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2025 | 3 | 333 MW |
| 2026 | 0 | 0 MW |
| 2027 | 2 | 300 MW |
Pipeline by grid and queue year
Tyr Energy's planned MW sits entirely in Midcontinent ISO (MISO).
Planned MW by grid operator
5 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| Midcontinent ISO (MISO) | 5 | 633 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2022 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2019 | 2 | 198 MW |
| 2020 | 0 | 0 MW |
| 2021 | 0 | 0 MW |
| 2022 | 3 | 435 MW |
Tyr Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Tyr Energy ranks 241 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 241 | Tyr Energy this page | 5 | 2 | 0.37 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Tyr Energy16 people at Tyr Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 4 managers and 4 directors are where interconnection and procurement decisions start.
By seniority
16 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 1 |
| VP | 6 |
| Director | 4 |
| Manager | 4 |
| Senior | 1 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Tyr Energy project
All 7 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 16 contacts.
Get alerts for Tyr Energy
We email you when Tyr Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Tyr Energy project and the 16 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.