FieldProspects

Two Oaks Solar

Power developer2 projects on record Data as of

Two Oaks Solar has 2 planned power projects totaling 168 MW in the FieldProspects database and no operating project on record. 0% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 1 state and 2 technologies.

168MW
planned, 2 projects
0MW
operating, 0 projects
0MW
interconnection agreement signed, 0% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
1
state
Map

Where Two Oaks Solar's planned pipeline sits

Planned MW by state. Everything sits in Virginia.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Virginia168 MW2 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
168 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Solar 118 MW
none
Battery Storage 50 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar1118 MW00 MW
Battery Storage150 MW00 MW

MW by technologySolar and Battery Storage have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed0 MW, 0%
0 of 2 planned projects (0%)
Under construction0 MW, 0%
0 of 2 planned projects (0%)
Past due0 MW, 0%
0 of 2 planned projects (0%)
0% of Two Oaks Solar's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Two Oaks Solar's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
050100150 Snapshot year 2026 2027 2028 118 MW 2029
View as table
YearProjectsMW
202600 MW
2027150 MW
202800 MW
20291118 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Two Oaks Solar's planned MW sits entirely in PJM Interconnection.

Figure 2

Planned MW by grid operator

2 planned projects

PJM Interconnection 168 MW 2 projects
View as table
GridPlanned projectsPlanned MW
PJM Interconnection2168 MW

Two Oaks Solar against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Two Oaks Solar ranks 551 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
551 Two Oaks Solar this page 2
168 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Two Oaks Solar

Every Two Oaks Solar project

All 2 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Two Oaks SolarSort: MW, largest first 2 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
2 projects and 168 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Two Oaks Solar

We email you when Two Oaks Solar adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Two Oaks Solar project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.