Triple Oak Power
Triple Oak Power has 3 planned power projects totaling 380 MW in the FieldProspects database and no operating project on record. 21% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 26 contacts at the company are on file.
Where Triple Oak Power's planned pipeline sits
Planned MW by state. The 2 largest states hold 380 MW of the 380 MW.
and no operating project on record yet. Everything here is pipeline.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Wind | 3 | 380 MW | 0 | 0 MW |
MW by technologyWind has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Triple Oak Power's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 0 | 0 MW |
| 2027 | 0 | 0 MW |
| 2028 | 0 | 0 MW |
| 2029 | 3 | 380 MW |
Pipeline by grid and queue year
Triple Oak Power's planned MW leans on Southwest Power Pool (SPP) and NorthWestern Energy. Southwest Power Pool (SPP) alone holds 79% of it.
Planned MW by grid operator
3 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| Southwest Power Pool (SPP) | 2 | 300 MW |
| NorthWestern Energy | 1 | 80 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2023 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2023 | 2 | 300 MW |
Triple Oak Power against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Triple Oak Power ranks 345 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 345 | Triple Oak Power this page | 3 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Triple Oak Power26 people at Triple Oak Power
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 9 managers and 8 directors are where interconnection and procurement decisions start.
By seniority
26 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 2 |
| Founder | 1 |
| VP | 6 |
| Director | 8 |
| Manager | 9 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Triple Oak Power project
All 3 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 26 contacts.
Get alerts for Triple Oak Power
We email you when Triple Oak Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Triple Oak Power project and the 26 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.