Power developer3 projects on record Data as of

Triple Oak Power has 3 planned power projects totaling 380 MW in the FieldProspects database and no operating project on record. 21% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 26 contacts at the company are on file.

380MW
planned, 3 projects
0MW
operating, 0 projects
80MW
interconnection agreement signed, 21% of planned
80MW
under construction, 1 project
0MW
past due, 0 projects
26
contacts on file
Map

Where Triple Oak Power's planned pipeline sits

Planned MW by state. The 2 largest states hold 380 MW of the 380 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Kansas300 MW2 projects, 79% of planned
  2. Montana80 MW1 project, 21% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
380 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Wind 380 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Wind3380 MW00 MW

MW by technologyWind has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed80 MW, 21%
1 of 3 planned projects (33%)
Under construction80 MW, 21%
1 of 3 planned projects (33%)
Past due0 MW, 0%
0 of 3 planned projects (0%)
0% of Triple Oak Power's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Triple Oak Power's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0100200300400 Snapshot year 2026 2027 2028 380 MW 2029
View as table
YearProjectsMW
202600 MW
202700 MW
202800 MW
20293380 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Triple Oak Power's planned MW leans on Southwest Power Pool (SPP) and NorthWestern Energy. Southwest Power Pool (SPP) alone holds 79% of it.

Figure 2

Planned MW by grid operator

3 planned projects

Southwest Power Pool (SPP) 300 MW 2 projects
NorthWestern Energy 80 MW 1 project
View as table
GridPlanned projectsPlanned MW
Southwest Power Pool (SPP)2300 MW
NorthWestern Energy180 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2023 was the biggest year.

0100200300 300 MW 2023
View as table
Queue yearProjectsMW
20232300 MW
Source. 1 project without a queue date is left out MW

Triple Oak Power against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Triple Oak Power ranks 345 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
345 Triple Oak Power this page 3
380 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Triple Oak Power

26 people at Triple Oak Power

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 9 managers and 8 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

26 contacts

C-Suite 2
Founder 1
VP 6
Director 8
Manager 9
View as table
SeniorityContacts
C-Suite2
Founder1
VP6
Director8
Manager9
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 26 contacts
PersonTitleDepartmentSeniorityContact
26 contacts at Triple Oak Power for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Triple Oak Power project

All 3 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Triple Oak PowerSort: MW, largest first 3 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
3 projects and 380 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 26 contacts.

Request access

Get alerts for Triple Oak Power

We email you when Triple Oak Power adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.