FieldProspects

Treaty Oak Clean Energy

Power developer8 projects on record Data as of

Treaty Oak Clean Energy has 7 planned power projects totaling 932 MW and 1 operating project totaling 100 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 32% is past its listed in-service date.

932MW
planned, 7 projects
100MW
operating, 1 project
932MW
interconnection agreement signed, 100% of planned
426.8MW
under construction, 2 projects
300MW
past due, 4 projects
62
contacts on file
Map

Where Treaty Oak Clean Energy's planned pipeline sits

Planned MW by state. The 3 largest states hold 932 MW of the 932 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Louisiana626.8 MW4 projects, 67% of planned
  2. Texas205.2 MW1 project, 22% of planned
  3. Arkansas100 MW2 projects, 11% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
9.3MW planned

for every MW Treaty Oak Clean Energy operates today. Solar is most of the gap.

PlannedOperating
Solar 726.8 MW
100 MW
Battery Storage 205.2 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar4726.8 MW1100 MW
Battery Storage3205.2 MW00 MW

MW by technologyBattery Storage has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed932 MW, 100%
7 of 7 planned projects (100%)
Under construction426.8 MW, 46%
2 of 7 planned projects (29%)
Past due300 MW, 32%
4 of 7 planned projects (57%)
32% of Treaty Oak Clean Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Treaty Oak Clean Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0200400600 Snapshot year 2025 2026 426.8 MW 2027 2028
View as table
YearProjectsMW
20254300 MW
202600 MW
20272426.8 MW
20281205.2 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Treaty Oak Clean Energy's planned MW leans on Midcontinent ISO (MISO) and ERCOT. Midcontinent ISO (MISO) alone holds 78% of it.

Figure 2

Planned MW by grid operator

7 planned projects

Midcontinent ISO (MISO) 726.8 MW 6 projects
ERCOT 205.2 MW 1 project
View as table
GridPlanned projectsPlanned MW
Midcontinent ISO (MISO)6726.8 MW
ERCOT1205.2 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2020 was the biggest year.

0100200300 300 MW 2020 2021 2022 2023
View as table
Queue yearProjectsMW
20204300 MW
202100 MW
202200 MW
20231205.2 MW
Source. 2 projects without a queue date are left out MW

Treaty Oak Clean Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Treaty Oak Clean Energy ranks 183 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
183 Treaty Oak Clean Energy this page 7
932 MW
1
100 MW
0.11

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Treaty Oak Clean Energy

62 people at Treaty Oak Clean Energy

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 27 managers and 15 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

62 contacts

C-Suite 3
VP 8
Director 15
Manager 27
Senior 9
View as table
SeniorityContacts
C-Suite3
VP8
Director15
Manager27
Senior9
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 62 contacts
PersonTitleDepartmentSeniorityContact
62 contacts at Treaty Oak Clean Energy for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Treaty Oak Clean Energy project

All 8 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Treaty Oak Clean EnergySort: MW, largest first 8 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
8 projects and 1 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 62 contacts.

Request access

Get alerts for Treaty Oak Clean Energy

We email you when Treaty Oak Clean Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Treaty Oak Clean Energy project and the 62 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.