Treaty Oak Clean Energy
Treaty Oak Clean Energy has 7 planned power projects totaling 932 MW and 1 operating project totaling 100 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 32% is past its listed in-service date.
Where Treaty Oak Clean Energy's planned pipeline sits
Planned MW by state. The 3 largest states hold 932 MW of the 932 MW.
for every MW Treaty Oak Clean Energy operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 4 | 726.8 MW | 1 | 100 MW |
| Battery Storage | 3 | 205.2 MW | 0 | 0 MW |
MW by technologyBattery Storage has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Treaty Oak Clean Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2025 | 4 | 300 MW |
| 2026 | 0 | 0 MW |
| 2027 | 2 | 426.8 MW |
| 2028 | 1 | 205.2 MW |
Pipeline by grid and queue year
Treaty Oak Clean Energy's planned MW leans on Midcontinent ISO (MISO) and ERCOT. Midcontinent ISO (MISO) alone holds 78% of it.
Planned MW by grid operator
7 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| Midcontinent ISO (MISO) | 6 | 726.8 MW |
| ERCOT | 1 | 205.2 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2020 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2020 | 4 | 300 MW |
| 2021 | 0 | 0 MW |
| 2022 | 0 | 0 MW |
| 2023 | 1 | 205.2 MW |
Treaty Oak Clean Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Treaty Oak Clean Energy ranks 183 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 183 | Treaty Oak Clean Energy this page | 7 | 1 | 0.11 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Treaty Oak Clean Energy62 people at Treaty Oak Clean Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 27 managers and 15 directors are where interconnection and procurement decisions start.
By seniority
62 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 3 |
| VP | 8 |
| Director | 15 |
| Manager | 27 |
| Senior | 9 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Treaty Oak Clean Energy project
All 8 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 62 contacts.
Get alerts for Treaty Oak Clean Energy
We email you when Treaty Oak Clean Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Treaty Oak Clean Energy project and the 62 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.