FieldProspects

TransAlta

Power developer4 projects on record Data as of

TransAlta has 2 planned power projects totaling 378 MW and 2 operating projects totaling 403 MW in the FieldProspects database. 0% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 3 states and 2 technologies.

378MW
planned, 2 projects
403MW
operating, 2 projects
0MW
interconnection agreement signed, 0% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
3
states
Map

Where TransAlta's planned pipeline sits

Planned MW by state. The 2 largest states hold 378 MW of the 378 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Washington200 MW1 project, 53% of planned
  2. Illinois178 MW1 project, 47% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
0.9MW planned

for every MW TransAlta operates today. Battery Storage is most of the gap.

PlannedOperating
Battery Storage 200 MW
none
Wind 178 MW
403 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage1200 MW00 MW
Wind1178 MW2403 MW

MW by technologyBattery Storage has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed0 MW, 0%
0 of 2 planned projects (0%)
Under construction0 MW, 0%
0 of 2 planned projects (0%)
Past due0 MW, 0%
0 of 2 planned projects (0%)
0% of TransAlta's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of TransAlta's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
050100150200 Snapshot year 2026 2027 200 MW 2028 2029
View as table
YearProjectsMW
202600 MW
202700 MW
20281200 MW
20291178 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

TransAlta's planned MW leans on Puget Sound Energy and Midcontinent ISO (MISO). Puget Sound Energy alone holds 53% of it.

Figure 2

Planned MW by grid operator

2 planned projects

Puget Sound Energy 200 MW 1 project
Midcontinent ISO (MISO) 178 MW 1 project
View as table
GridPlanned projectsPlanned MW
Puget Sound Energy1200 MW
Midcontinent ISO (MISO)1178 MW
Source. Balancing authorities as listed in the queue

Changes since the June 4, 2026 snapshot

What moved in TransAlta's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
1
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: TransAltaChange: any 1 change since June 4, 2026
ChangeProjectTechnologyStateMWGrid
1 changed project behind this preview

Members see each changed project with its name, location and dates, and get an email when TransAlta's pipeline moves.

Request access

TransAlta against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. TransAlta ranks 346 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
346 TransAlta this page 2
378 MW
2
403 MW
1.07

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus TransAlta

Every TransAlta project

All 4 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: TransAltaSort: MW, largest first 4 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
4 projects and 781 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for TransAlta

We email you when TransAlta adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every TransAlta project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.