TotalEnergies

Power developer42 projects on record Data as of

TotalEnergies has 25 planned power projects totaling 7.3 GW and 17 operating projects totaling 515.6 MW in the FieldProspects database. 84% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 7 states and 2 technologies.

7.3GW
planned, 25 projects
515.6MW
operating, 17 projects
6.1GW
interconnection agreement signed, 84% of planned
435MW
under construction, 2 projects
0MW
past due, 0 projects
7
states
Map

Where TotalEnergies' planned pipeline sits

Planned MW by state. The 4 largest states hold 7.3 GW of the 7.3 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas6.9 GW21 projects, 94% of planned
  2. Ohio155 MW1 project, 2% of planned
  3. Georgia150 MW1 project, 2% of planned
  4. Virginia120 MW2 projects, 2% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
14.1MW planned

for every MW TotalEnergies operates today. Solar is most of the gap.

PlannedOperating
Solar 6.8 GW
63 MW
Battery Storage 535.6 MW
452.6 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar216.8 GW963 MW
Battery Storage4535.6 MW8452.6 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed6.1 GW, 84%
19 of 25 planned projects (76%)
Under construction435 MW, 6%
2 of 25 planned projects (8%)
Past due0 MW, 0%
0 of 25 planned projects (0%)
0% of TotalEnergies' planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of TotalEnergies' planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
01k2k3k4k Snapshot year 3.8 GW 2026 2027 2028 2029 2030
View as table
YearProjectsMW
2026113.8 GW
202761.6 GW
202861.7 GW
2029160 MW
2030160 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

TotalEnergies' planned MW leans on ERCOT, PJM Interconnection and Southern Company. ERCOT alone holds 94% of it.

Figure 2

Planned MW by grid operator

25 planned projects

ERCOT 6.9 GW 21 projects
PJM Interconnection 275 MW 3 projects
Southern Company 150 MW 1 project
View as table
GridPlanned projectsPlanned MW
ERCOT216.9 GW
PJM Interconnection3275 MW
Southern Company1150 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2022 was the biggest year.

05001k1.5k 2017 2018 2019 2020 2021 1.5 GW 2022 2023
View as table
Queue yearProjectsMW
20172672.6 MW
20181602.8 MW
20191155 MW
202000 MW
20211405.7 MW
202261.5 GW
20233810 MW
Source. 11 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in TotalEnergies' queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
12
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: TotalEnergiesChange: any 13 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
13 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when TotalEnergies' pipeline moves.

Request access

TotalEnergies against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. TotalEnergies ranks 20 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
20 TotalEnergies this page 25
7.3 GW
17
515.6 MW
0.07

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus TotalEnergies

Every TotalEnergies project

All 42 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: TotalEnergiesSort: MW, largest first 42 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
42 projects and 7.8 GW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for TotalEnergies

We email you when TotalEnergies adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every TotalEnergies project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.