TotalEnergies
TotalEnergies has 25 planned power projects totaling 7.3 GW and 17 operating projects totaling 515.6 MW in the FieldProspects database. 84% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 7 states and 2 technologies.
Where TotalEnergies' planned pipeline sits
Planned MW by state. The 4 largest states hold 7.3 GW of the 7.3 GW.
for every MW TotalEnergies operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 21 | 6.8 GW | 9 | 63 MW |
| Battery Storage | 4 | 535.6 MW | 8 | 452.6 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of TotalEnergies' planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 11 | 3.8 GW |
| 2027 | 6 | 1.6 GW |
| 2028 | 6 | 1.7 GW |
| 2029 | 1 | 60 MW |
| 2030 | 1 | 60 MW |
Pipeline by grid and queue year
TotalEnergies' planned MW leans on ERCOT, PJM Interconnection and Southern Company. ERCOT alone holds 94% of it.
Planned MW by grid operator
25 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 21 | 6.9 GW |
| PJM Interconnection | 3 | 275 MW |
| Southern Company | 1 | 150 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2022 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2017 | 2 | 672.6 MW |
| 2018 | 1 | 602.8 MW |
| 2019 | 1 | 155 MW |
| 2020 | 0 | 0 MW |
| 2021 | 1 | 405.7 MW |
| 2022 | 6 | 1.5 GW |
| 2023 | 3 | 810 MW |
Changes since the June 4, 2026 snapshot
What moved in TotalEnergies' queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when TotalEnergies' pipeline moves.
TotalEnergies against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. TotalEnergies ranks 20 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 20 | TotalEnergies this page | 25 | 17 | 0.07 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus TotalEnergiesEvery TotalEnergies project
All 42 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both.
Get alerts for TotalEnergies
We email you when TotalEnergies adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every TotalEnergies project, with its county, dates and queue status.