Torch Clean Energy

Power developer10 projects on record Data as of

Torch Clean Energy has 8 planned power projects totaling 440.4 MW and 2 operating projects totaling 150 MW in the FieldProspects database. 77% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 2 contacts at the company are on file.

440.4MW
planned, 8 projects
150MW
operating, 2 projects
340.4MW
interconnection agreement signed, 77% of planned
28.4MW
under construction, 2 projects
0MW
past due, 0 projects
2
contacts on file
Map

Where Torch Clean Energy's planned pipeline sits

Planned MW by state. The 2 largest states hold 440.4 MW of the 440.4 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Virginia241.4 MW6 projects, 55% of planned
  2. West Virginia199 MW2 projects, 45% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
2.9MW planned

for every MW Torch Clean Energy operates today. Solar is most of the gap.

PlannedOperating
Solar 440.4 MW
150 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar8440.4 MW2150 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed340.4 MW, 77%
7 of 8 planned projects (88%)
Under construction28.4 MW, 6%
2 of 8 planned projects (25%)
Past due0 MW, 0%
0 of 8 planned projects (0%)
0% of Torch Clean Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Torch Clean Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
050100150 Snapshot year 99 MW 2026 2027 113.5 MW 2028 2029 2030 2031
View as table
YearProjectsMW
2026199 MW
2027234.9 MW
20282113.5 MW
202900 MW
203000 MW
2031141 MW
Source. 2 projects with no listed date are left out MW

Pipeline by grid and queue year

Torch Clean Energy's planned MW sits entirely in PJM Interconnection.

Figure 2

Planned MW by grid operator

8 planned projects

PJM Interconnection 440.4 MW 8 projects
View as table
GridPlanned projectsPlanned MW
PJM Interconnection8440.4 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2019 was the biggest year.

050100150200 174.9 MW 2019 2020
View as table
Queue yearProjectsMW
20194174.9 MW
20203165.5 MW
Source. 1 project without a queue date is left out MW

Changes since the June 4, 2026 snapshot

What moved in Torch Clean Energy's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
1
cancelled, inactive or dropped
0
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Torch Clean EnergyChange: any 1 change since June 4, 2026
ChangeProjectTechnologyStateMWGrid
1 changed project behind this preview

Members see each changed project with its name, location and dates, and get an email when Torch Clean Energy's pipeline moves.

Request access

Torch Clean Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Torch Clean Energy ranks 306 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
306 Torch Clean Energy this page 8
440.4 MW
2
150 MW
0.34

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Torch Clean Energy

2 people at Torch Clean Energy

Contacts with title, seniority, department, email and LinkedIn, counted here and never named.

Figure 4

By seniority

2 contacts

C-Suite 1
Senior 1
View as table
SeniorityContacts
C-Suite1
Senior1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 2 contacts
PersonTitleDepartmentSeniorityContact
2 contacts at Torch Clean Energy for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Torch Clean Energy project

All 10 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Torch Clean EnergySort: MW, largest first 10 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
10 projects and 590.4 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 2 contacts.

Request access

Get alerts for Torch Clean Energy

We email you when Torch Clean Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Torch Clean Energy project and the 2 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.