FieldProspects

Titus Low Carbon Ventures

Power developer17 projects on record Data as of

Titus Low Carbon Ventures has 17 planned power projects totaling 4 GW in the FieldProspects database and no operating project on record. 16% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 7 contacts at the company are on file.

4GW
planned, 17 projects
0MW
operating, 0 projects
649.4MW
interconnection agreement signed, 16% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
7
contacts on file
Map

Where Titus Low Carbon Ventures' planned pipeline sits

Planned MW by state. Everything sits in Texas.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas4 GW17 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
4 GWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Solar 2.7 GW
none
Battery Storage 996.5 MW
none
Wind 302.9 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar82.7 GW00 MW
Battery Storage8996.5 MW00 MW
Wind1302.9 MW00 MW

MW by technology3 technologies have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed649.4 MW, 16%
4 of 17 planned projects (24%)
Under construction0 MW, 0%
0 of 17 planned projects (0%)
Past due0 MW, 0%
0 of 17 planned projects (0%)
0% of Titus Low Carbon Ventures' planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Titus Low Carbon Ventures' planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
05001k1.5k2k Snapshot year 2026 2027 2028 1.8 GW 2029 2030
View as table
YearProjectsMW
202600 MW
202700 MW
202881.6 GW
202971.8 GW
20302657 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Titus Low Carbon Ventures' planned MW sits entirely in ERCOT.

Figure 2

Planned MW by grid operator

17 planned projects

ERCOT 4 GW 17 projects
View as table
GridPlanned projectsPlanned MW
ERCOT174 GW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2025 was the biggest year.

01k2k3k 2023 2024 2 GW 2025
View as table
Queue yearProjectsMW
202331 GW
20246939.3 MW
202582 GW
Source. Every planned project has a queue date MW

Changes since the June 4, 2026 snapshot

What moved in Titus Low Carbon Ventures' queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
6
cancelled, inactive or dropped
8
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Titus Low Carbon VenturesChange: any 18 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
18 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Titus Low Carbon Ventures' pipeline moves.

Request access

Titus Low Carbon Ventures against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Titus Low Carbon Ventures ranks 42 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
42 Titus Low Carbon Ventures this page 17
4 GW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Titus Low Carbon Ventures

7 people at Titus Low Carbon Ventures

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 2 managers and 2 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

7 contacts

C-Suite 2
VP 1
Director 2
Manager 2
View as table
SeniorityContacts
C-Suite2
VP1
Director2
Manager2
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 7 contacts
PersonTitleDepartmentSeniorityContact
7 contacts at Titus Low Carbon Ventures for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Titus Low Carbon Ventures project

All 17 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Titus Low Carbon VenturesSort: MW, largest first 17 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
17 projects and 4 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 7 contacts.

Request access

Get alerts for Titus Low Carbon Ventures

We email you when Titus Low Carbon Ventures adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Titus Low Carbon Ventures project and the 7 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.