FieldProspects

Tesla

Power developer25 projects on record Data as of

Tesla has 10 planned power projects totaling 337.4 MW and 15 operating projects totaling 389.4 MW in the FieldProspects database. 79% of the planned capacity has an interconnection agreement and 39% is past its listed in-service date. It also has 1 data center record.

337.4MW
planned, 10 projects
389.4MW
operating, 15 projects
265.4MW
interconnection agreement signed, 79% of planned
2MW
under construction, 2 projects
133MW
past due, 1 project
1
data center
Map

Where Tesla's planned pipeline sits

Planned MW by state. The 3 largest states hold 337.4 MW of the 337.4 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas332.6 MW5 projects, 99% of planned
  2. California3.8 MW4 projects, 1% of planned
  3. Nevada1 MW1 project, 0% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
0.9MW planned

for every MW Tesla operates today. Battery Storage is most of the gap.

PlannedOperating
Battery Storage 383.6 MW
375 MW
Solar none
14.4 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage3383.6 MW3375 MW
Solar7-46.2 MW1214.4 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed265.4 MW, 79%
8 of 10 planned projects (80%)
Under construction2 MW, 1%
2 of 10 planned projects (20%)
Past due133 MW, 39%
1 of 10 planned projects (10%)
40% of Tesla's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Tesla's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
050100150 Snapshot year 133 MW 2025 132.4 MW 2026 2027
View as table
YearProjectsMW
20251133 MW
20267132.4 MW
2027272 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Tesla's planned MW leans on ERCOT, California ISO (CAISO) and Nevada Power (NV Energy). ERCOT alone holds 99% of it.

Figure 2

Planned MW by grid operator

10 planned projects

ERCOT 332.6 MW 5 projects
California ISO (CAISO) 3.8 MW 4 projects
Nevada Power (NV Energy) 1 MW 1 project
View as table
GridPlanned projectsPlanned MW
ERCOT5332.6 MW
California ISO (CAISO)43.8 MW
Nevada Power (NV Energy)11 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2024 was the biggest year.

0100200300 2022 2023 258.3 MW 2024
View as table
Queue yearProjectsMW
20221-53.3 MW
20231125.3 MW
20242258.3 MW
Source. 6 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in Tesla's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
6
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: TeslaChange: any 6 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
6 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Tesla's pipeline moves.

Request access

Tesla against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Tesla ranks 360 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
360 Tesla this page 10
337.4 MW
15
389.4 MW
1.15

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Tesla

Every Tesla project

All 25 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: TeslaSort: MW, largest first 25 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
25 projects and 726.8 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Tesla

We email you when Tesla adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Tesla project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.