Terra-Gen
Terra-Gen has 15 planned power projects totaling 3.1 GW and 14 operating projects totaling 1.3 GW in the FieldProspects database. 19% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 100 contacts at the company are on file.
Where Terra-Gen's planned pipeline sits
Planned MW by state. The 3 largest states hold 3.1 GW of the 3.1 GW.
Largest states
- New York2.3 GW11 projects, 72% of planned
- Texas626.8 MW3 projects, 20% of planned
- California261 MW1 project, 8% of planned
for every MW Terra-Gen operates today. Wind is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Wind | 5 | 1.3 GW | 1 | 238.5 MW |
| Battery Storage | 7 | 1.2 GW | 7 | 477.3 MW |
| Solar | 3 | 612.6 MW | 6 | 537.8 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Terra-Gen's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 1 | 213.8 MW |
| 2027 | 2 | 360.8 MW |
| 2028 | 3 | 449.2 MW |
| 2029 | 2 | 760 MW |
| 2030 | 6 | 1.1 GW |
| 2031 | 0 | 0 MW |
| 2032 | 0 | 0 MW |
| 2033 | 1 | 261 MW |
Pipeline by grid and queue year
Terra-Gen's planned MW leans on New York ISO (NYISO), ERCOT and California ISO (CAISO). New York ISO (NYISO) alone holds 72% of it.
Planned MW by grid operator
15 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| New York ISO (NYISO) | 11 | 2.3 GW |
| ERCOT | 3 | 626.8 MW |
| California ISO (CAISO) | 1 | 261 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2026 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2016 | 1 | 199.2 MW |
| 2017 | 0 | 0 MW |
| 2018 | 0 | 0 MW |
| 2019 | 1 | 147 MW |
| 2020 | 0 | 0 MW |
| 2021 | 1 | 261 MW |
| 2022 | 2 | 427.6 MW |
| 2023 | 0 | 0 MW |
| 2024 | 0 | 0 MW |
| 2025 | 0 | 0 MW |
| 2026 | 10 | 2.1 GW |
Changes since the June 4, 2026 snapshot
What moved in Terra-Gen's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Terra-Gen's pipeline moves.
Terra-Gen against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Terra-Gen ranks 50 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 50 | Terra-Gen this page | 15 | 14 | 0.40 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Terra-Gen100 people at Terra-Gen
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 41 managers and 29 directors are where interconnection and procurement decisions start.
By seniority
100 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 4 |
| Head | 1 |
| VP | 20 |
| Director | 29 |
| Manager | 41 |
| Senior | 5 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Terra-Gen project
All 29 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 100 contacts.
Get alerts for Terra-Gen
We email you when Terra-Gen adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Terra-Gen project and the 100 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.