Power developer2 projects on record Data as of

Tennessee Valley Authority has 2 planned power projects totaling 213 MW in the FieldProspects database and no operating project on record. 9% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 2 states and 2 technologies.

213MW
planned, 2 projects
0MW
operating, 0 projects
20MW
interconnection agreement signed, 9% of planned
20MW
under construction, 1 project
0MW
past due, 0 projects
2
states
Map

Where Tennessee Valley Authority's planned pipeline sits

Planned MW by state. The 2 largest states hold 213 MW of the 213 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Alabama193 MW1 project, 91% of planned
  2. Tennessee20 MW1 project, 9% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
213 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Solar 193 MW
none
Battery Storage 20 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar1193 MW00 MW
Battery Storage120 MW00 MW

MW by technologySolar and Battery Storage have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed20 MW, 9%
1 of 2 planned projects (50%)
Under construction20 MW, 9%
1 of 2 planned projects (50%)
Past due0 MW, 0%
0 of 2 planned projects (0%)
None of Tennessee Valley Authority's planned MW sits in the seven ISO queues, where 11% of planned MW is past due across all developers.

Share of Tennessee Valley Authority's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
050100150200 Snapshot year 20 MW 2026 193 MW 2027
View as table
YearProjectsMW
2026120 MW
20271193 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Tennessee Valley Authority's planned MW sits entirely in Tennessee Valley Authority.

Figure 2

Planned MW by grid operator

2 planned projects

Tennessee Valley Authority 213 MW 2 projects
View as table
GridPlanned projectsPlanned MW
Tennessee Valley Authority2213 MW

Tennessee Valley Authority against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Tennessee Valley Authority ranks 459 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
459 Tennessee Valley Authority this page 2
213 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Tennessee Valley Authority

Every Tennessee Valley Authority project

All 2 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Tennessee Valley AuthoritySort: MW, largest first 2 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
2 projects and 213 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Tennessee Valley Authority

We email you when Tennessee Valley Authority adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Tennessee Valley Authority project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.