TED Renewables

Power developer7 projects on record Data as of

TED Renewables has 6 planned power projects totaling 1.1 GW and 1 operating project totaling 99 MW in the FieldProspects database. 69% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 14 contacts at the company are on file.

1.1GW
planned, 6 projects
99MW
operating, 1 project
740.9MW
interconnection agreement signed, 69% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
14
contacts on file
Map

Where TED Renewables' planned pipeline sits

Planned MW by state. The 4 largest states hold 1.1 GW of the 1.1 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Oklahoma591 MW3 projects, 55% of planned
  2. Kansas330 MW1 project, 31% of planned
  3. West Virginia100 MW1 project, 9% of planned
  4. Ohio49.9 MW1 project, 5% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
10.8MW planned

for every MW TED Renewables operates today. Solar is most of the gap.

PlannedOperating
Solar 1.1 GW
99 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar61.1 GW199 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed740.9 MW, 69%
5 of 6 planned projects (83%)
Under construction0 MW, 0%
0 of 6 planned projects (0%)
Past due0 MW, 0%
0 of 6 planned projects (0%)
0% of TED Renewables' planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of TED Renewables' planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0200400600 Snapshot year 330 MW 2026 2027 2028 591 MW 2029
View as table
YearProjectsMW
20261330 MW
202700 MW
20282149.9 MW
20293591 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

TED Renewables' planned MW leans on Southwest Power Pool (SPP) and PJM Interconnection. Southwest Power Pool (SPP) alone holds 86% of it.

Figure 2

Planned MW by grid operator

6 planned projects

Southwest Power Pool (SPP) 921 MW 4 projects
PJM Interconnection 149.9 MW 2 projects
View as table
GridPlanned projectsPlanned MW
Southwest Power Pool (SPP)4921 MW
PJM Interconnection2149.9 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2023 was the biggest year.

02505007501k 2020 2021 2022 921 MW 2023
View as table
Queue yearProjectsMW
20202149.9 MW
202100 MW
202200 MW
20234921 MW
Source. Every planned project has a queue date MW

Changes since the June 4, 2026 snapshot

What moved in TED Renewables' queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
1
cancelled, inactive or dropped
4
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: TED RenewablesChange: any 8 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
8 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when TED Renewables' pipeline moves.

Request access

TED Renewables against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. TED Renewables ranks 156 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
156 TED Renewables this page 6
1.1 GW
1
99 MW
0.09

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus TED Renewables

14 people at TED Renewables

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 3 managers and 4 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

14 contacts

C-Suite 2
VP 4
Director 4
Manager 3
Senior 1
View as table
SeniorityContacts
C-Suite2
VP4
Director4
Manager3
Senior1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 14 contacts
PersonTitleDepartmentSeniorityContact
14 contacts at TED Renewables for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every TED Renewables project

All 7 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: TED RenewablesSort: MW, largest first 7 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
7 projects and 1.2 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 14 contacts.

Request access

Get alerts for TED Renewables

We email you when TED Renewables adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every TED Renewables project and the 14 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.