FieldProspects

Tampa Electric

Power developer13 projects on record Data as of

Tampa Electric has 4 planned power projects totaling 189.2 MW and 9 operating projects totaling 438.7 MW in the FieldProspects database. 89% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 1 state and 2 technologies.

189.2MW
planned, 4 projects
438.7MW
operating, 9 projects
169.2MW
interconnection agreement signed, 89% of planned
169.2MW
under construction, 3 projects
0MW
past due, 0 projects
1
state
Map

Where Tampa Electric's planned pipeline sits

Planned MW by state. Everything sits in Florida.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Florida189.2 MW4 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
0.4MW planned

for every MW Tampa Electric operates today.

PlannedOperating
Solar 169.2 MW
323.7 MW
Battery Storage 20 MW
115 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar3169.2 MW5323.7 MW
Battery Storage120 MW4115 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed169.2 MW, 89%
3 of 4 planned projects (75%)
Under construction169.2 MW, 89%
3 of 4 planned projects (75%)
Past due0 MW, 0%
0 of 4 planned projects (0%)
None of Tampa Electric's planned MW sits in the seven ISO queues, where 11% of planned MW is past due across all developers.

Share of Tampa Electric's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
050100150200 Snapshot year 169.2 MW 2026 2027
View as table
YearProjectsMW
20263169.2 MW
2027120 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Tampa Electric's planned MW sits entirely in Tampa Electric.

Figure 2

Planned MW by grid operator

4 planned projects

Tampa Electric 189.2 MW 4 projects
View as table
GridPlanned projectsPlanned MW
Tampa Electric4189.2 MW

Changes since the June 4, 2026 snapshot

What moved in Tampa Electric's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+1
project added, 20 MW
0
came online
0
cancelled, inactive or dropped
0
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Tampa ElectricChange: any 1 change since June 4, 2026
ChangeProjectTechnologyStateMWGrid
1 changed project behind this preview

Members see each changed project with its name, location and dates, and get an email when Tampa Electric's pipeline moves.

Request access

Tampa Electric against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Tampa Electric ranks 536 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
536 Tampa Electric this page 4
189.2 MW
9
438.7 MW
2.32

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Tampa Electric

Every Tampa Electric project

All 13 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Tampa ElectricSort: MW, largest first 13 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
13 projects and 627.9 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Tampa Electric

We email you when Tampa Electric adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Tampa Electric project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.