Power developer18 projects on record Data as of

Swift Current Energy has 12 planned power projects totaling 3.2 GW and 6 operating projects totaling 1 GW in the FieldProspects database. 80% of the planned capacity has an interconnection agreement and 31% is past its listed in-service date. 65 contacts at the company are on file.

3.2GW
planned, 12 projects
1GW
operating, 6 projects
2.6GW
interconnection agreement signed, 80% of planned
349MW
under construction, 3 projects
979.8MW
past due, 3 projects
65
contacts on file
Map

Where Swift Current Energy's planned pipeline sits

Planned MW by state. The 6 largest states hold 3.1 GW of the 3.2 GW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Illinois1.2 GW3 projects, 38% of planned
  2. Pennsylvania1.1 GW3 projects, 33% of planned
  3. Minnesota288 MW1 project, 9% of planned
  4. Maine200 MW2 projects, 6% of planned
  5. Texas195 MW1 project, 6% of planned
  6. Virginia150 MW1 project, 5% of planned

1 more state with less.

Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
3.1MW planned

for every MW Swift Current Energy operates today. Solar is most of the gap.

PlannedOperating
Solar 2.7 GW
892.1 MW
Battery Storage 479 MW
151.4 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar102.7 GW4892.1 MW
Battery Storage2479 MW2151.4 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed2.6 GW, 80%
10 of 12 planned projects (83%)
Under construction349 MW, 11%
3 of 12 planned projects (25%)
Past due979.8 MW, 31%
3 of 12 planned projects (25%)
31% of Swift Current Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Swift Current Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
02505007501k Snapshot year 2023 2024 2025 545 MW 2026 2027 2028 2029 878 MW 2030
View as table
YearProjectsMW
2023199 MW
20241592.8 MW
20251288 MW
20264545 MW
202700 MW
20281401.6 MW
20291401.6 MW
20303878 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Swift Current Energy's planned MW leans on New York ISO (NYISO), Midcontinent ISO (MISO) and PJM Interconnection. New York ISO (NYISO) alone holds 33% of it.

Figure 2

Planned MW by grid operator

12 planned projects

New York ISO (NYISO) 1.1 GW 3 projects
Midcontinent ISO (MISO) 979.8 MW 3 projects
PJM Interconnection 778 MW 3 projects
ISO New England 200 MW 2 projects
ERCOT 195 MW 1 project
View as table
GridPlanned projectsPlanned MW
New York ISO (NYISO)31.1 GW
Midcontinent ISO (MISO)3979.8 MW
PJM Interconnection3778 MW
ISO New England2200 MW
ERCOT1195 MW
Source. Balancing authorities as listed in the queue
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2019 was the biggest year.

05001k1.5k 1.4 GW 2019 2020 2021 2022
View as table
Queue yearProjectsMW
201961.4 GW
20202730.6 MW
202100 MW
20221288 MW
Source. 3 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in Swift Current Energy's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
1
came online
0
cancelled, inactive or dropped
3
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Swift Current EnergyChange: any 4 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
4 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Swift Current Energy's pipeline moves.

Request access

Swift Current Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Swift Current Energy ranks 49 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
49 Swift Current Energy this page 12
3.2 GW
6
1 GW
0.33

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Swift Current Energy

65 people at Swift Current Energy

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 22 managers and 14 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

65 contacts

C-Suite 4
Founder 3
VP 17
Director 14
Manager 22
Senior 5
View as table
SeniorityContacts
C-Suite4
Founder3
VP17
Director14
Manager22
Senior5
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 65 contacts
PersonTitleDepartmentSeniorityContact
65 contacts at Swift Current Energy for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Swift Current Energy project

All 18 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Swift Current EnergySort: MW, largest first 18 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
18 projects and 4.2 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 65 contacts.

Request access

Get alerts for Swift Current Energy

We email you when Swift Current Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Swift Current Energy project and the 65 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.