Swift Current Energy
Swift Current Energy has 12 planned power projects totaling 3.2 GW and 6 operating projects totaling 1 GW in the FieldProspects database. 80% of the planned capacity has an interconnection agreement and 31% is past its listed in-service date. 65 contacts at the company are on file.
Where Swift Current Energy's planned pipeline sits
Planned MW by state. The 6 largest states hold 3.1 GW of the 3.2 GW.
for every MW Swift Current Energy operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 10 | 2.7 GW | 4 | 892.1 MW |
| Battery Storage | 2 | 479 MW | 2 | 151.4 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Swift Current Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2023 | 1 | 99 MW |
| 2024 | 1 | 592.8 MW |
| 2025 | 1 | 288 MW |
| 2026 | 4 | 545 MW |
| 2027 | 0 | 0 MW |
| 2028 | 1 | 401.6 MW |
| 2029 | 1 | 401.6 MW |
| 2030 | 3 | 878 MW |
Pipeline by grid and queue year
Swift Current Energy's planned MW leans on New York ISO (NYISO), Midcontinent ISO (MISO) and PJM Interconnection. New York ISO (NYISO) alone holds 33% of it.
Planned MW by grid operator
12 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| New York ISO (NYISO) | 3 | 1.1 GW |
| Midcontinent ISO (MISO) | 3 | 979.8 MW |
| PJM Interconnection | 3 | 778 MW |
| ISO New England | 2 | 200 MW |
| ERCOT | 1 | 195 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2019 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2019 | 6 | 1.4 GW |
| 2020 | 2 | 730.6 MW |
| 2021 | 0 | 0 MW |
| 2022 | 1 | 288 MW |
Changes since the June 4, 2026 snapshot
What moved in Swift Current Energy's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Swift Current Energy's pipeline moves.
Swift Current Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Swift Current Energy ranks 49 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 49 | Swift Current Energy this page | 12 | 6 | 0.33 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Swift Current Energy65 people at Swift Current Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 22 managers and 14 directors are where interconnection and procurement decisions start.
By seniority
65 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 4 |
| Founder | 3 |
| VP | 17 |
| Director | 14 |
| Manager | 22 |
| Senior | 5 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Swift Current Energy project
All 18 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 65 contacts.
Get alerts for Swift Current Energy
We email you when Swift Current Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Swift Current Energy project and the 65 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.