FieldProspects

SWEB Development

Power developer1 project on record Data as of

SWEB Development has 1 planned power project totaling 96 MW in the FieldProspects database and no operating project on record. 0% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 1 state and 1 technology.

96MW
planned, 1 project
0MW
operating, 0 projects
0MW
interconnection agreement signed, 0% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
1
state
Map

Where SWEB Development's planned pipeline sits

Planned MW by state. Everything sits in New York.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. New York96 MW1 project, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
96 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Solar 96 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar196 MW00 MW

MW by technologySolar has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed0 MW, 0%
0 of 1 planned project (0%)
Under construction0 MW, 0%
0 of 1 planned project (0%)
Past due0 MW, 0%
0 of 1 planned project (0%)
0% of SWEB Development's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of SWEB Development's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0255075100 Snapshot year 2026 2027 2028 2029 96 MW 2030
View as table
YearProjectsMW
202600 MW
202700 MW
202800 MW
202900 MW
2030196 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

SWEB Development's planned MW sits entirely in New York ISO (NYISO).

Figure 2

Planned MW by grid operator

1 planned project

New York ISO (NYISO) 96 MW 1 project
View as table
GridPlanned projectsPlanned MW
New York ISO (NYISO)196 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2026 was the biggest year.

0255075100 96 MW 2026
View as table
Queue yearProjectsMW
2026196 MW
Source. Every planned project has a queue date MW

Changes since the June 4, 2026 snapshot

What moved in SWEB Development's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+1
project added, 96 MW
0
came online
0
cancelled, inactive or dropped
0
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: SWEB DevelopmentChange: any 1 change since June 4, 2026
ChangeProjectTechnologyStateMWGrid
1 changed project behind this preview

Members see each changed project with its name, location and dates, and get an email when SWEB Development's pipeline moves.

Request access

SWEB Development against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. SWEB Development ranks 643 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
643 SWEB Development this page 1
96 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus SWEB Development

Every SWEB Development project

The one project with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: SWEB DevelopmentSort: MW, largest first 1 project
ProjectCountyGridMWQueue dateIn serviceAgreement
1 project and 96 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for SWEB Development

We email you when SWEB Development adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every SWEB Development project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.