Power developer18 projects on record Data as of

Sunraycer Assets has 14 planned power projects totaling 1.9 GW and 4 operating projects totaling 377 MW in the FieldProspects database. 41% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 26 contacts at the company are on file.

1.9GW
planned, 14 projects
377MW
operating, 4 projects
780.6MW
interconnection agreement signed, 41% of planned
251.4MW
under construction, 2 projects
0MW
past due, 0 projects
26
contacts on file
Map

Where Sunraycer Assets' planned pipeline sits

Planned MW by state. Everything sits in Texas.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas1.9 GW14 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
5MW planned

for every MW Sunraycer Assets operates today. Battery Storage is most of the gap.

PlannedOperating
Battery Storage 969.3 MW
126.8 MW
Solar 914.6 MW
250.2 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage9969.3 MW2126.8 MW
Solar5914.6 MW2250.2 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed780.6 MW, 41%
5 of 14 planned projects (36%)
Under construction251.4 MW, 13%
2 of 14 planned projects (14%)
Past due0 MW, 0%
0 of 14 planned projects (0%)
0% of Sunraycer Assets' planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Sunraycer Assets' planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
05001k1.5k2k Snapshot year 202.7 MW 2026 1.6 GW 2027 2028
View as table
YearProjectsMW
20261202.7 MW
2027121.6 GW
2028150.4 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Sunraycer Assets' planned MW sits entirely in ERCOT.

Figure 2

Planned MW by grid operator

14 planned projects

ERCOT 1.9 GW 14 projects
View as table
GridPlanned projectsPlanned MW
ERCOT141.9 GW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2021 was the biggest year.

0200400600800 613.2 MW 2021 2022 2023
View as table
Queue yearProjectsMW
20214613.2 MW
2022150.4 MW
20231202.7 MW
Source. 8 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in Sunraycer Assets' queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+1
project added, 200.5 MW
7
came online
0
cancelled, inactive or dropped
1
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Sunraycer AssetsChange: any 11 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
11 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Sunraycer Assets' pipeline moves.

Request access

Sunraycer Assets against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Sunraycer Assets ranks 91 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
91 Sunraycer Assets this page 14
1.9 GW
4
377 MW
0.20

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Sunraycer Assets

26 people at Sunraycer Assets

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 6 managers and 10 directors are where interconnection and procurement decisions start.

Figure 4

By seniority

26 contacts

C-Suite 1
VP 5
Director 10
Manager 6
Senior 4
View as table
SeniorityContacts
C-Suite1
VP5
Director10
Manager6
Senior4
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 26 contacts
PersonTitleDepartmentSeniorityContact
26 contacts at Sunraycer Assets for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Sunraycer Assets project

All 18 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Sunraycer AssetsSort: MW, largest first 18 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
18 projects and 2.3 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 26 contacts.

Request access

Get alerts for Sunraycer Assets

We email you when Sunraycer Assets adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Sunraycer Assets project and the 26 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.