Power developer8 projects on record Data as of

SunEnergy1 has 8 planned power projects totaling 920 MW in the FieldProspects database and no operating project on record. 100% of the planned capacity has an interconnection agreement and 20% is past its listed in-service date. The projects sit in 3 states and 1 technology.

920MW
planned, 8 projects
0MW
operating, 0 projects
920MW
interconnection agreement signed, 100% of planned
550MW
under construction, 4 projects
180MW
past due, 1 project
3
states
Map

Where SunEnergy1's planned pipeline sits

Planned MW by state. The 3 largest states hold 920 MW of the 920 MW.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. North Carolina630 MW5 projects, 68% of planned
  2. Ohio210 MW2 projects, 23% of planned
  3. Virginia80 MW1 project, 9% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
920 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Solar 920 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar8920 MW00 MW

MW by technologySolar has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed920 MW, 100%
8 of 8 planned projects (100%)
Under construction550 MW, 60%
4 of 8 planned projects (50%)
Past due180 MW, 20%
1 of 8 planned projects (13%)
20% of SunEnergy1's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of SunEnergy1's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0100200300 Snapshot year 2025 220 MW 2026 230 MW 2027 2028 2029 2030 2031
View as table
YearProjectsMW
20251180 MW
20262220 MW
20272230 MW
2028170 MW
20291140 MW
203000 MW
2031180 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

SunEnergy1's planned MW sits entirely in PJM Interconnection.

Figure 2

Planned MW by grid operator

8 planned projects

PJM Interconnection 920 MW 8 projects
View as table
GridPlanned projectsPlanned MW
PJM Interconnection8920 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2016 was the biggest year.

0200400600 410 MW 2016 2017 2018 2019 2020
View as table
Queue yearProjectsMW
20164410 MW
201700 MW
20181150 MW
20192280 MW
2020180 MW
Source. Every planned project has a queue date MW

Changes since the June 4, 2026 snapshot

What moved in SunEnergy1's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
1
cancelled, inactive or dropped
0
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: SunEnergy1Change: any 1 change since June 4, 2026
ChangeProjectTechnologyStateMWGrid
1 changed project behind this preview

Members see each changed project with its name, location and dates, and get an email when SunEnergy1's pipeline moves.

Request access

SunEnergy1 against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. SunEnergy1 ranks 184 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
184 SunEnergy1 this page 8
920 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus SunEnergy1

Every SunEnergy1 project

All 8 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: SunEnergy1Sort: MW, largest first 8 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
8 projects and 920 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for SunEnergy1

We email you when SunEnergy1 adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every SunEnergy1 project, with its county, dates and queue status.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.