Power developer11 projects on record Data as of

SunEast Development has 11 planned power projects totaling 220 MW in the FieldProspects database and no operating project on record. 55% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 4 contacts at the company are on file.

220MW
planned, 11 projects
0MW
operating, 0 projects
120MW
interconnection agreement signed, 55% of planned
60MW
under construction, 3 projects
0MW
past due, 0 projects
4
contacts on file
Map

Where SunEast Development's planned pipeline sits

Planned MW by state. Everything sits in New York.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. New York220 MW11 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
220 MWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Solar 220 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Solar11220 MW00 MW

MW by technologySolar has no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed120 MW, 55%
6 of 11 planned projects (55%)
Under construction60 MW, 27%
3 of 11 planned projects (27%)
Past due0 MW, 0%
0 of 11 planned projects (0%)
0% of SunEast Development's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of SunEast Development's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
050100150200 Snapshot year 2026 200 MW 2027 2028
View as table
YearProjectsMW
202600 MW
202710200 MW
2028120 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

SunEast Development's planned MW sits entirely in New York ISO (NYISO).

Figure 2

Planned MW by grid operator

11 planned projects

New York ISO (NYISO) 220 MW 11 projects
View as table
GridPlanned projectsPlanned MW
New York ISO (NYISO)11220 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2019 was the biggest year.

0204060 60 MW 2019
View as table
Queue yearProjectsMW
2019360 MW
Source. 8 projects without a queue date are left out MW

Changes since the June 4, 2026 snapshot

What moved in SunEast Development's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
1
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: SunEast DevelopmentChange: any 1 change since June 4, 2026
ChangeProjectTechnologyStateMWGrid
1 changed project behind this preview

Members see each changed project with its name, location and dates, and get an email when SunEast Development's pipeline moves.

Request access

SunEast Development against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. SunEast Development ranks 453 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
453 SunEast Development this page 11
220 MW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus SunEast Development

4 people at SunEast Development

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 1 manager are where interconnection and procurement decisions start.

Figure 4

By seniority

4 contacts

C-Suite 1
VP 2
Manager 1
View as table
SeniorityContacts
C-Suite1
VP2
Manager1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 4 contacts
PersonTitleDepartmentSeniorityContact
4 contacts at SunEast Development for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every SunEast Development project

All 11 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: SunEast DevelopmentSort: MW, largest first 11 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
11 projects and 220 MW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 4 contacts.

Request access

Get alerts for SunEast Development

We email you when SunEast Development adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every SunEast Development project and the 4 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.