Strata Clean Energy
Strata Clean Energy has 7 planned power projects totaling 1.3 GW and 4 operating projects totaling 475 MW in the FieldProspects database. 51% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 143 contacts at the company are on file.
Where Strata Clean Energy's planned pipeline sits
Planned MW by state. The 4 largest states hold 1.3 GW of the 1.3 GW.
for every MW Strata Clean Energy operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 6 | 1.1 GW | 0 | 0 MW |
| Battery Storage | 1 | 250 MW | 4 | 475 MW |
MW by technologySolar has no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Strata Clean Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 0 | 0 MW |
| 2027 | 4 | 789 MW |
| 2028 | 0 | 0 MW |
| 2029 | 0 | 0 MW |
| 2030 | 3 | 520 MW |
Pipeline by grid and queue year
Strata Clean Energy's planned MW leans on Midcontinent ISO (MISO), California ISO (CAISO) and PJM Interconnection. Midcontinent ISO (MISO) alone holds 49% of it.
Planned MW by grid operator
7 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| Midcontinent ISO (MISO) | 3 | 640 MW |
| California ISO (CAISO) | 2 | 418 MW |
| PJM Interconnection | 2 | 251 MW |
When the planned projects entered the queue
Planned MW by queue request year. 2017 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2017 | 2 | 418 MW |
| 2018 | 1 | 149 MW |
| 2019 | 1 | 102 MW |
Changes since the June 4, 2026 snapshot
What moved in Strata Clean Energy's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Strata Clean Energy's pipeline moves.
Strata Clean Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Strata Clean Energy ranks 123 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 123 | Strata Clean Energy this page | 7 | 4 | 0.36 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Strata Clean Energy143 people at Strata Clean Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 75 managers and 35 directors are where interconnection and procurement decisions start.
By seniority
143 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 6 |
| Partner | 2 |
| VP | 11 |
| Director | 35 |
| Manager | 75 |
| Senior | 14 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Strata Clean Energy project
All 11 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 143 contacts.
Get alerts for Strata Clean Energy
We email you when Strata Clean Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Strata Clean Energy project and the 143 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.