FieldProspects

Stella ESS

Power developer6 projects on record Data as of

Stella ESS has 3 planned power projects totaling 415 MW and 3 operating projects totaling 29.7 MW in the FieldProspects database. 51% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. The projects sit in 1 state and 1 technology.

415MW
planned, 3 projects
29.7MW
operating, 3 projects
210.7MW
interconnection agreement signed, 51% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
1
state
Map

Where Stella ESS's planned pipeline sits

Planned MW by state. Everything sits in Texas.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas415 MW3 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
14MW planned

for every MW Stella ESS operates today. Battery Storage is most of the gap.

PlannedOperating
Battery Storage 415 MW
29.7 MW
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage3415 MW329.7 MW

MW by technologyPlanned and operating MW

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed210.7 MW, 51%
2 of 3 planned projects (67%)
Under construction0 MW, 0%
0 of 3 planned projects (0%)
Past due0 MW, 0%
0 of 3 planned projects (0%)
0% of Stella ESS's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Stella ESS's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
0200400600 Snapshot year 9.9 MW 2026 2027 405.1 MW 2028
View as table
YearProjectsMW
202619.9 MW
202700 MW
20282405.1 MW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Stella ESS's planned MW sits entirely in ERCOT.

Figure 2

Planned MW by grid operator

3 planned projects

ERCOT 415 MW 3 projects
View as table
GridPlanned projectsPlanned MW
ERCOT3415 MW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2024 was the biggest year.

0100200300 2023 204.3 MW 2024
View as table
Queue yearProjectsMW
20231200.8 MW
20241204.3 MW
Source. 1 project without a queue date is left out MW

Changes since the June 4, 2026 snapshot

What moved in Stella ESS's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
3
came online
0
cancelled, inactive or dropped
2
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Stella ESSChange: any 5 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
5 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Stella ESS's pipeline moves.

Request access

Stella ESS against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Stella ESS ranks 311 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
311 Stella ESS this page 3
415 MW
3
29.7 MW
0.07

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Stella ESS

Every Stella ESS project

All 6 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Stella ESSSort: MW, largest first 6 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
6 projects and 444.7 MW behind this preview

Project names never appear next to their developer on public pages. Members see both.

Request access

Get alerts for Stella ESS

We email you when Stella ESS adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Stella ESS project, with its county, dates and queue status.