Solvent Energy
Solvent Energy has 12 planned power projects totaling 2.5 GW in the FieldProspects database and no operating project on record. 19% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 3 contacts at the company are on file.
Where Solvent Energy's planned pipeline sits
Planned MW by state. Everything sits in Texas.
Largest states
- Texas2.5 GW12 projects, 100% of planned
and no operating project on record yet. Everything here is pipeline.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Battery Storage | 10 | 2.1 GW | 0 | 0 MW |
| Solar | 2 | 481.8 MW | 0 | 0 MW |
MW by technologyBattery Storage and Solar have no operating projects
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Solvent Energy's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 0 | 0 MW |
| 2027 | 2 | 512.2 MW |
| 2028 | 4 | 666 MW |
| 2029 | 6 | 1.4 GW |
Pipeline by grid and queue year
Solvent Energy's planned MW sits entirely in ERCOT.
Planned MW by grid operator
12 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| ERCOT | 12 | 2.5 GW |
When the planned projects entered the queue
Planned MW by queue request year. 2023 was the biggest year.
View as table
| Queue year | Projects | MW |
|---|---|---|
| 2022 | 2 | 409.6 MW |
| 2023 | 8 | 1.6 GW |
| 2024 | 2 | 512.2 MW |
Changes since the June 4, 2026 snapshot
What moved in Solvent Energy's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Solvent Energy's pipeline moves.
Solvent Energy against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Solvent Energy ranks 65 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 65 | Solvent Energy this page | 12 | 0 | 0.00 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Solvent Energy3 people at Solvent Energy
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 1 director are where interconnection and procurement decisions start.
By seniority
3 contacts
View as table
| Seniority | Contacts |
|---|---|
| C-Suite | 1 |
| VP | 1 |
| Director | 1 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Solvent Energy project
All 12 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 3 contacts.
Get alerts for Solvent Energy
We email you when Solvent Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Solvent Energy project and the 3 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.