Power developer12 projects on record Data as of

Solvent Energy has 12 planned power projects totaling 2.5 GW in the FieldProspects database and no operating project on record. 19% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 3 contacts at the company are on file.

2.5GW
planned, 12 projects
0MW
operating, 0 projects
491.6MW
interconnection agreement signed, 19% of planned
0MW
under construction, 0 projects
0MW
past due, 0 projects
3
contacts on file
Map

Where Solvent Energy's planned pipeline sits

Planned MW by state. Everything sits in Texas.

none planned under 250 MW250 to 1,000 MW1,000 to 2,500 MW2,500 to 5,000 MW5,000 MW or more

Largest states

  1. Texas2.5 GW12 projects, 100% of planned
Source. ISO and RTO interconnection queues and EIA-860M, via FieldProspects Hover a state for its numbers
Planned against delivered
2.5 GWplanned

and no operating project on record yet. Everything here is pipeline.

PlannedOperating
Battery Storage 2.1 GW
none
Solar 481.8 MW
none
View as table
TechnologyPlanned projectsPlanned MWOperating projectsOperating MW
Battery Storage102.1 GW00 MW
Solar2481.8 MW00 MW

MW by technologyBattery Storage and Solar have no operating projects

How much of the pipeline is real

An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.

Interconnection agreement signed491.6 MW, 19%
2 of 12 planned projects (17%)
Under construction0 MW, 0%
0 of 12 planned projects (0%)
Past due0 MW, 0%
0 of 12 planned projects (0%)
0% of Solvent Energy's planned MW in the seven ISO queues is past due, against 11% for all developers.

Share of Solvent Energy's planned MWSee the queue slip report

Figure 1

Planned MW by listed in-service year

Projects listed before 2026 and still planned are past due.

Past dueDue 2026 or later
05001k1.5k Snapshot year 2026 2027 2028 1.4 GW 2029
View as table
YearProjectsMW
202600 MW
20272512.2 MW
20284666 MW
202961.4 GW
Source. Every planned project lists a date MW

Pipeline by grid and queue year

Solvent Energy's planned MW sits entirely in ERCOT.

Figure 2

Planned MW by grid operator

12 planned projects

ERCOT 2.5 GW 12 projects
View as table
GridPlanned projectsPlanned MW
ERCOT122.5 GW
Figure 3

When the planned projects entered the queue

Planned MW by queue request year. 2023 was the biggest year.

05001k1.5k2k 2022 1.6 GW 2023 2024
View as table
Queue yearProjectsMW
20222409.6 MW
202381.6 GW
20242512.2 MW
Source. Every planned project has a queue date MW

Changes since the June 4, 2026 snapshot

What moved in Solvent Energy's queue position between June 4, 2026 and October 8, 2026.

See every change across all developers
+0
projects added, 0 MW
0
came online
0
cancelled, inactive or dropped
6
slipped a date

Which projects were added, finished, cancelled or shelved

Members only
Developer: Solvent EnergyChange: any 6 changes since June 4, 2026
ChangeProjectTechnologyStateMWGrid
6 changed projects behind this preview

Members see each changed project with its name, location and dates, and get an email when Solvent Energy's pipeline moves.

Request access

Solvent Energy against the nine largest developers

The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Solvent Energy ranks 65 of 815 developers with a planned project.

#DeveloperPlanned projectsPlanned MWOperating projectsOperating MWOperating per planned
1 NextEra Energy 191
36.8 GW
75
11.7 GW
0.32
2 Invenergy 135
27.1 GW
28
4.5 GW
0.17
3 Intersect Power 54
25.3 GW
5
1.2 GW
0.05
4 Hecate Energy 41
18.1 GW
8
1 GW
0.06
5 Engie 80
17.6 GW
51
4.3 GW
0.24
6 RWE 78
12.8 GW
20
3.2 GW
0.25
7 Avantus 49
12.5 GW
10
1.7 GW
0.14
8 EDF Renewables 54
11.7 GW
15
1.4 GW
0.12
9 OCI Energy 45
10.6 GW
1
100 MW
0.01
65 Solvent Energy this page 12
2.5 GW
0
0 MW
0.00

Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.

Top 9 by planned MW, plus Solvent Energy

3 people at Solvent Energy

Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 1 director are where interconnection and procurement decisions start.

Figure 4

By seniority

3 contacts

C-Suite 1
VP 1
Director 1
View as table
SeniorityContacts
C-Suite1
VP1
Director1
Source. FieldProspects contacts table, counts only

Sample rows

Illustrative rows, names and details removed.

Members only
Seniority: Director and above 3 contacts
PersonTitleDepartmentSeniorityContact
3 contacts at Solvent Energy for members

Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.

Request access

Every Solvent Energy project

All 12 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.

Members only
Developer: Solvent EnergySort: MW, largest first 12 projects
ProjectCountyGridMWQueue dateIn serviceAgreement
12 projects and 2.5 GW behind this preview

Project names never appear next to their developer on public pages. Members see both, plus the 3 contacts.

Request access

Get alerts for Solvent Energy

We email you when Solvent Energy adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.

One email per snapshot, only when something changed. Unsubscribe any time.

See every Solvent Energy project and the 3 people behind them.

Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.