SolRiver
SolRiver has 2 planned power projects totaling 12.1 MW and 13 operating projects totaling 54.7 MW in the FieldProspects database. 0% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 6 contacts at the company are on file.
Where SolRiver's planned pipeline sits
Planned MW by state. The 2 largest states hold 12.1 MW of the 12.1 MW.
Largest states
- South Carolina9.6 MW1 project, 79% of planned
- Oregon2.5 MW1 project, 21% of planned
for every MW SolRiver operates today.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 2 | 12.1 MW | 13 | 54.7 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of SolRiver's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 0 | 0 MW |
| 2027 | 2 | 12.1 MW |
Pipeline by grid and queue year
SolRiver's planned MW leans on Duke Energy Progress East and PacifiCorp West. Duke Energy Progress East alone holds 79% of it.
Planned MW by grid operator
2 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| Duke Energy Progress East | 1 | 9.6 MW |
| PacifiCorp West | 1 | 2.5 MW |
Changes since the June 4, 2026 snapshot
What moved in SolRiver's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when SolRiver's pipeline moves.
SolRiver against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. SolRiver ranks 743 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 743 | SolRiver this page | 2 | 13 | 4.52 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus SolRiver6 people at SolRiver
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 1 manager and 1 director are where interconnection and procurement decisions start.
By seniority
6 contacts
View as table
| Seniority | Contacts |
|---|---|
| Partner | 2 |
| VP | 1 |
| Director | 1 |
| Manager | 1 |
| Senior | 1 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every SolRiver project
All 15 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 6 contacts.
Get alerts for SolRiver
We email you when SolRiver adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every SolRiver project and the 6 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.