Solar Liberty
Solar Liberty has 4 planned power projects totaling 17.1 MW and 2 operating projects totaling 8.3 MW in the FieldProspects database. 100% of the planned capacity has an interconnection agreement and 0% is past its listed in-service date. 7 contacts at the company are on file.
Where Solar Liberty's planned pipeline sits
Planned MW by state. Everything sits in New York.
Largest states
- New York17.1 MW4 projects, 100% of planned
for every MW Solar Liberty operates today. Solar is most of the gap.
View as table
| Technology | Planned projects | Planned MW | Operating projects | Operating MW |
|---|---|---|---|---|
| Solar | 4 | 17.1 MW | 2 | 8.3 MW |
MW by technologyPlanned and operating MW
How much of the pipeline is real
An interconnection agreement and a construction start are the two strongest signals that a queue project will be built. A listed date that has already passed is the strongest sign it will not be built on time.
Share of Solar Liberty's planned MWSee the queue slip report
Planned MW by listed in-service year
Projects listed before 2026 and still planned are past due.
View as table
| Year | Projects | MW |
|---|---|---|
| 2026 | 4 | 17.1 MW |
Pipeline by grid and queue year
Solar Liberty's planned MW sits entirely in New York ISO (NYISO).
Planned MW by grid operator
4 planned projects
View as table
| Grid | Planned projects | Planned MW |
|---|---|---|
| New York ISO (NYISO) | 4 | 17.1 MW |
Changes since the June 4, 2026 snapshot
What moved in Solar Liberty's queue position between June 4, 2026 and October 8, 2026.
Which projects were added, finished, cancelled or shelved
| Change | Project | Technology | State | MW | Grid |
|---|---|---|---|---|---|
Members see each changed project with its name, location and dates, and get an email when Solar Liberty's pipeline moves.
Solar Liberty against the nine largest developers
The nine largest planned pipelines in the database, ranked by planned MW. NextEra Energy leads with 36.8 GW planned. Solar Liberty ranks 735 of 815 developers with a planned project.
| # | Developer | Planned projects | Planned MW | Operating projects | Operating MW | Operating per planned |
|---|---|---|---|---|---|---|
| 1 | NextEra Energy | 191 | 75 | 0.32 | ||
| 2 | Invenergy | 135 | 28 | 0.17 | ||
| 3 | Intersect Power | 54 | 5 | 0.05 | ||
| 4 | Hecate Energy | 41 | 8 | 0.06 | ||
| 5 | Engie | 80 | 51 | 0.24 | ||
| 6 | RWE | 78 | 20 | 0.25 | ||
| 7 | Avantus | 49 | 10 | 0.14 | ||
| 8 | EDF Renewables | 54 | 15 | 0.12 | ||
| 9 | OCI Energy | 45 | 1 | 0.01 | ||
| 735 | Solar Liberty this page | 4 | 2 | 0.49 |
Operating per planned is operating MW divided by planned MW. A low ratio means a pipeline far larger than the fleet already built.
Top 9 by planned MW, plus Solar Liberty7 people at Solar Liberty
Contacts with title, seniority, department, email and LinkedIn, counted here and never named. 6 managers are where interconnection and procurement decisions start.
By seniority
7 contacts
View as table
| Seniority | Contacts |
|---|---|
| VP | 1 |
| Manager | 6 |
Sample rows
Illustrative rows, names and details removed.
| Person | Title | Department | Seniority | Contact |
|---|---|---|---|---|
Names, titles, direct emails and LinkedIn profiles, matched to the projects they work on.
Every Solar Liberty project
All 6 projects with name, county, grid, MW, queue date, in-service date, interconnection status and construction status. Filter, sort and export to Excel.
| Project | County | Grid | MW | Queue date | In service | Agreement |
|---|---|---|---|---|---|---|
Project names never appear next to their developer on public pages. Members see both, plus the 7 contacts.
Get alerts for Solar Liberty
We email you when Solar Liberty adds a project, signs an interconnection agreement, starts construction, slips a date or drops a project. One email per snapshot, only when something changed.
See every Solar Liberty project and the 7 people behind them.
Solo is $250 a month for one user. Unlimited is $500 for your whole team. Cancel any time.